Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM1000000027AUI |
Model Year Start: 2023 |
Model: Corolla Hatchback |
Prod Date Range: [09/2022 -
] |
Title: M20A-FKS (ENGINE MECHANICAL): CYLINDER HEAD GASKET: INSTALLATION; 2023 - 2025 MY Corolla Corolla Hatchback [09/2022 - ] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL CYLINDER HEAD GASKET
(a) Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
(b) Place a new cylinder head gasket on the cylinder block sub-assembly as shown in the illustration.
*a
|
Lot No.
|
|
Front of Engine
|
NOTICE:
Make sure to install the cylinder head gasket in the correct direction.
2. INSTALL CYLINDER HEAD SUB-ASSEMBLY
Click here
3. INSTALL EXHAUST CAMSHAFT SUB-ASSEMBLY
Click here
4. INSTALL INTAKE CAMSHAFT SUB-ASSEMBLY
Click here
5. INSTALL CAMSHAFT BEARING CAP
Click here
6. INSTALL VALVE LASH ADJUSTER ASSEMBLY
Click here
7. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
Click here
8. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY
Click here
9. INSTALL FUEL PUMP LIFTER GUIDE
Click here
10. INSTALL TIMING CHAIN COVER ASSEMBLY
Click here
11. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY
Click here
12. SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Click here
13. INSTALL NO. 1 CHAIN VIBRATION DAMPER
Click here
14. INSTALL CHAIN TENSIONER SLIPPER
Click here
15. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
Click here
16. INSTALL CHAIN SUB-ASSEMBLY
Click here
17. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY
Click here
18. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY
Click here
19. SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Click here
20. INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY
Click here
21. INSTALL TIMING CHAIN COVER OIL SEAL
Click here
22. INSTALL SPARK PLUG TUBE GASKET
Click here
23. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Click here
24. INSTALL WATER BY-PASS OUTLET SUB-ASSEMBLY
Click here
25. INSTALL WATER OUTLET
Click here
26. INSTALL CRANKSHAFT PULLEY ASSEMBLY
Click here
27. INSTALL VACUUM PUMP ASSEMBLY
Click here
28. INSTALL CAM TIMING CONTROL MOTOR O-RING
Click here
29. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY
Click here
30. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY
Click here
31. INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY
Click here
32. INSTALL VACUUM SURGE TANK
Click here
33. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Click here
34. INSTALL IGNITION COIL ASSEMBLY
Click here
35. INSTALL FUEL INJECTOR SEAL
Click here
36. INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Click here
37. INSTALL FUEL DELIVERY PIPE
Click here
38. INSTALL PORT FUEL INJECTOR ASSEMBLY
Click here
39. INSTALL NO. 5 ENGINE WIRE
Click here
40. INSTALL INJECTOR VIBRATION INSULATOR
Click here
41. INSTALL FUEL DELIVERY SPACER
Click here
42. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Click here
43. INSTALL NO. 1 WATER BY-PASS HOSE ASSEMBLY
Click here
44. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)
Click here
45. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Click here
46. INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)
Click here
47. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Click here
48. CONNECT FUEL TUBE SUB-ASSEMBLY
Click here
49. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
Click here
50. INSTALL INTAKE MANIFOLD
Click here
51. CONNECT NO. 1 FUEL VAPOR FEED HOSE
Click here
52. INSTALL INTAKE MANIFOLD STAY
Click here
53. INSTALL NO. 3 WATER BY-PASS PIPE
Click here
54. INSTALL EGR VALVE ASSEMBLY
Click here
55. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
Click here
56. INSTALL EGR COOLER ASSEMBLY
Click here
57. INSTALL THROTTLE BODY GASKET
Click here
58. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Click here
59. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)
for Double Wishbone Type Suspension: Click here
for Torsion Beam Type Suspension: Click here
60. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
for Double Wishbone Type Suspension: Click here
for Torsion Beam Type Suspension: Click here
61. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
Click here
62. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Click here
63. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Click here
64. INSTALL ENGINE HANGER
Click here
65. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
Click here
|