Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM10000000268I9 |
Model Year Start: 2023 |
Model: GR Corolla |
Prod Date Range: [09/2022 - 11/2022] |
Title: G16E-GTS (EMISSION CONTROL): PCV VALVE: REMOVAL; 2023 MY GR Corolla [09/2022 - 11/2022] |
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during PCV valve (ventilation valve sub-assembly) removal/installation are shown below.
Necessary Procedures After Parts Removed/Installed/Replaced
Replaced Part or Performed Procedure
|
Necessary Procedure
|
Effect/Inoperative Function when Necessary Procedure not Performed
|
Link
|
-
Replacement of throttle body with motor assembly
-
Cleaning the deposits from the throttle body with motor assembly
|
Inspection After Repair
|
-
Poor idle, etc.
-
Engine start function, etc.
|
|
NOTICE:
This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
HINT:
When the cable is disconnected / reconnected to the battery terminal, systems temporarily stop operating. However, each system has a function that completes learning the first time the system is used.
Learning completes when vehicle is driven
Effect/Inoperative Function when Necessary Procedure not Performed
|
Necessary Procedure
|
Link
|
Front Camera System (for TMC Made)
|
Drive the vehicle straight ahead at 35 km/h (22 mph) or more for 5 seconds or more.
|
|
Learning completes when vehicle is operated normally
Effect/Inoperative Function when Necessary Procedure not Performed
|
Necessary Procedure
|
Link
|
Power Door Lock Control System
|
Perform door unlock operation with door control switch or electrical key transmitter sub-assembly switch.
|
|
PROCEDURE
1. REMOVE INTAKE MANIFOLD
Click here
2. REMOVE PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
|