Last Modified: 05-13-2024 |
6.11:8.1.0 |
Doc ID: RM10000000260TT |
Model Year Start: 2023 |
Model: GR Corolla |
Prod Date Range: [09/2022 -
] |
Title: G16E-GTS (ENGINE MECHANICAL): ENGINE UNIT: INSTALLATION; 2023 - 2025 MY GR Corolla [09/2022 - ] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL TIMING GEAR COVER INSULATOR
(a) Install the timing gear cover insulator to the cylinder block sub-assembly.
2. INSTALL NO. 3 CYLINDER BLOCK INSULATOR
(a) Install the No. 3 cylinder block insulator to the oil pan sub-assembly.
3. INSTALL INTAKE PIPE OR HOSE STAY
(a) Install the intake pipe or hose stay to the cylinder head cover sub-assembly with the 3 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
4. INSTALL FUEL HOSE BRACKET
(a) Install the fuel hose bracket to the cylinder head cover sub-assembly with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
5. INSTALL ENGINE COVER BRACKET
(a) Install the engine cover bracket to the No. 1 vacuum pump bracket with the bolt.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
6. INSTALL ENGINE COVER JOINT
(a) Install the 2 engine cover joints to the cylinder head cover sub-assembly.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
7. INSTALL IGNITION COIL ASSEMBLY
Click here
8. INSTALL VACUUM REGULATING VALVE ASSEMBLY
(a) Install the vacuum regulating valve assembly to the cylinder head cover sub-assembly with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
9. INSTALL VENTILATION HOSE
(a) Install the ventilation hose to the cylinder head cover sub-assembly and slide the clip to secure it.
(b) Engage the clamp.
10. INSTALL SENSOR WIRE
(a) Install the sensor wire to the cylinder head sub-assembly and cylinder block sub-assembly with the 2 bolts.
Torque:
Bolt (A) :
10 N·m {102 kgf·cm, 7 ft·lbf}
Bolt (B) :
21 N·m {214 kgf·cm, 15 ft·lbf}
|
|
11. INSTALL NO. 2 CYLINDER BLOCK INSULATOR
(a) Install the No. 2 cylinder block insulator to the cylinder block sub-assembly.
12. INSTALL FUEL INJECTOR SEAL
Click here
13. INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Click here
14. INSTALL NO. 6 ENGINE WIRE
Click here
15. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Click here
16. INSTALL FUEL PUMP ASSEMBLY
Click here
17. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Click here
18. INSTALL INJECTOR VIBRATION INSULATOR
Click here
19. INSTALL FUEL DELIVERY SPACER
Click here
20. INSTALL FUEL DELIVERY PIPE
Click here
21. INSTALL NO. 1 DELIVERY PIPE SPACER
(a) Install the 2 No. 1 delivery pipe spacers to the cylinder head sub-asembly.
22. INSTALL FUEL DELIVERY GUARD
Click here
23. INSTALL OIL LEVEL GAGE GUIDE
Click here
24. INSTALL OIL LEVEL GAGE SUB-ASSEMBLY
Click here
25. INSTALL FUEL TUBE SUB-ASSEMBLY
(a) Install the fuel tube sub-assembly.
Click here
(b) Install the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(c) Install the fuel pipe clamp to the fuel tube connector.
26. INSTALL NO. 7 ENGINE WIRE
(a) Connect the 2 connectors and install the No. 7 engine wire.
(b) Engage the clamp.
27. INSTALL WATER BY-PASS PIPE
(a) Install the water by-pass pipe to the water inlet with thermostat sub-assembly and slide the clip to secure it.
(b) Install the bolt and nut.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
28. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
Click here
29. INSTALL NO. 1 VENTILATION FLANGE SEPARATOR
Click here
30. INSTALL INTAKE MANIFOLD
Click here
31. INSTALL INTAKE AIR CONNECTOR BRACKET
Click here
32. INSTALL NO. 2 ENGINE COVER BRACKET
(a) Install the No. 2 engine cover bracket to the intake manifold with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
33. CONNECT NO. 6 ENGINE WIRE
(a) Engage the 5 clamps and connect the No. 6 engine wire.
34. INSTALL PURGE VALVE (PURGE VSV)
Click here
35. INSTALL NO. 2 TURBO INSULATOR
(a) Install the No. 2 turbo insulator to the cylinder block sub-assembly with the 2 bolts.
Torque:
Bolt (A) :
21 N·m {214 kgf·cm, 15 ft·lbf}
Bolt (B) :
30 N·m {306 kgf·cm, 22 ft·lbf}
|
|
36. INSTALL EXHAUST MANIFOLD TO HEAD GASKET
Click here
37. INSTALL TURBOCHARGER SUB-ASSEMBLY
(a) Install the turbocharger sub-assembly to the cylinder head sub-assembly with the 7 new nuts.
Torque:
Nut (B) :
44.3 N·m {452 kgf·cm, 33 ft·lbf}
|
|
(b) Connect the No. 1 turbo water pipe sub-assembly with the 2 bolts.
Torque:
Bolt (A) :
13 N·m {133 kgf·cm, 10 ft·lbf}
Bolt (C) :
35 N·m {357 kgf·cm, 26 ft·lbf}
(c) Install the inlet turbo oil pipe union bolt.
Torque:
Bolt (C) :
35 N·m {357 kgf·cm, 26 ft·lbf}
(d) Connect the outlet turbo oil pipe with the 2 bolts.
Torque:
Bolt (D) :
13 N·m {133 kgf·cm, 10 ft·lbf}
38. INSTALL NO. 1 TURBO INSULATOR
Click here
39. INSTALL NO. 4 CYLINDER BLOCK INSULATOR
(a) Install the No. 4 cylinder brock insulator with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
40. INSTALL DRIVE SHAFT BEARING BRACKET
(a) Install the drive shaft bearing bracket to the cylinder block sub-assembly with the 3 bolts.
Torque:
63.7 N·m {650 kgf·cm, 47 ft·lbf}
41. INSTALL ENGINE HANGER BRACKET
(a) Install the engine hanger bracket to the cylinder head sub-assembly with the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
42. INSTALL INTAKE AIR PIPE
(a) Install the intake air pipe and tighten the hose clamp.
Torque:
4.0 N·m {41 kgf·cm, 35 in·lbf}
|
|
(b) Install the 3 bolts.
Torque:
Bolt (A) :
21 N·m {214 kgf·cm, 15 ft·lbf}
Bolt (B) :
10 N·m {102 kgf·cm, 7 ft·lbf}
(c) Connect the ventilation hose.
(d) Connect the No. 2 vacuum transmitting hose.
(e) Connect the No. 1 vacuum transmitting hose.
43. INSTALL VACUUM SENSOR ASSEMBLY
Click here
44. INSTALL E.F.I. VACUUM SENSOR ASSEMBLY (MANIFOLD ABSOLUTE PRESSURE SENSOR)
Click here
45. INSTALL WATER BY-PASS HOSE ASSEMBLY
(a) Install the water by-pass hose assembly and slide the 2 clip to secure it.
(b) Engage the clamp.
46. INSTALL NO. 4 WATER BY-PASS PIPE
(a) Install the No. 4 water by-pass pipe and slide the clip to secure it.
|
|
(b) Install the No. 4 water by-pass pipe with the 3 bolts in the order shown in the illustration.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
47. INSTALL NO. 3 WATER BY-PASS PIPE
(a) Install the No. 3 water by-pass pipe and slide the clip to secure it.
(b) Connect the No. 3 water by-pass pipe with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
48. INSTALL NO. 1 WATER BY-PASS PIPE
(a) Install the No. 1 water by-pass pipe and slide the clip to secure it.
(b) Connect the No. 1 water by-pass pipe with the bolt and nut.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
49. INSTALL NO. 1 TURBO WATER HOSE
(a) Install the No. 1 turbo water hose and slide the 2 clips to secure it.
50. INSTALL NO. 3 VACUUM TRANSMITTING HOSE
(a) Install the No. 3 vacuum transmitting hose.
(b) Engage the 2 clamps.
51. INSTALL NO. 5 WATER BY-PASS HOSE
(a) Install the No. 5 water by-pass hose and slide the 2 clips to secure it.
(b) Install the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
52. INSTALL NO. 6 WATER BY-PASS HOSE
(a) Install the No. 6 water by-pass hose and slide the 2 clips to secure it.
(b) Engage the clamp.
53. INSTALL NO. 5 AIR HOSE
(a) Install the No. 5 air hose and tighten the hose clamp.
Torque:
6.0 N·m {61 kgf·cm, 53 in·lbf}
54. INSTALL NO. 2 AIR HOSE
(a) Install the No. 2 air hose and tighten the hose clamp.
Torque:
6.0 N·m {61 kgf·cm, 53 in·lbf}
55. INSTALL FUEL TUBE SUB-ASSEMBLY
(a) Install the fuel tube sub-assembly to the fuel pipe sub-assembly.
Click here
(b) Engage the clamp.
56. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY
Click here
|