Last Modified: 05-13-2024 |
6.11:8.1.0 |
Doc ID: RM10000000255VV |
Model Year Start: 2023 |
Model: GR Corolla |
Prod Date Range: [09/2022 -
] |
Title: G16E-GTS (ENGINE CONTROL): SFI SYSTEM: Lack of Power (Turbocharger System); 2023 - 2025 MY GR Corolla [09/2022 - ] |
Lack of Power (Turbocharger System)
|
CAUTION / NOTICE / HINT
HINT:
-
The diagnosis flowchart is for lack of power due to turbocharger factors.
-
If symptom-specific diagnosis indicates a turbocharger related problem, check using this flowchart.
PROCEDURE
1.
|
CHECK TURBOCHARGER SUB-ASSEMBLY
|
(a) Check for oil leaks and large carbon deposits around the connecting surfaces of the turbocharger sub-assembly.
HINT:
If oil leaks or a large amount of carbon deposits exist, air leaks from the respective sealing surfaces may be causing the lack of boost pressure.
Result
|
Proceed to
|
An oil leak or large amount of carbon deposits does not exist.
|
A
|
A large amount of carbon deposits exist around the turbine housing, flange or gaskets in any of the areas (A) shown in the illustration.
|
B
|
A large amount of carbon deposits exist around the waste gate valve link.
|
C
|
Oil is leaking from V-clamp in the area (B) shown in the illustration.
|
D
|
Oil is leaking from the compressor housing in any of the areas (C) shown in the illustration.
|
E
|
E |
|
CHECK AND REPAIR AIR TUBE OR HOSE CLAMP
|
A
|
|
|
2.
|
CHECK TURBOCHARGER SUB-ASSEMBLY (INSPECT TURBINE SHAFT)
|
(a) Check that the turbine shaft rotates smoothly, without catching.
(b) Check for loose turbine mounting nuts and for axial play in the turbine shaft.
Click here
HINT:
If the turbine shaft catches or there is no play, seal failure due to seizure or improper operation due to accumulation of deposits is suspected.
Result
|
Proceed to
|
No turbine shaft malfunction
|
A
|
Turbine shaft malfunction
|
B
|
A
|
|
|
3.
|
CHECK TURBOCHARGER SUB-ASSEMBLY (INSPECT WASTE GATE VALVE)
|
(a) Use a vacuum pump to apply -35 +/-4.0 kPa (-263 +/-35 mmHg) negative pressure to the diaphragm chamber and check that the waste gate valve seats.
NOTICE:
Do not apply a negative pressure of -65 kPa (-488 mmHg) or more to the waste gate valve actuator with bracket assembly, as doing so may damage the diaphragm.
Standard:
Waste gate valve seats without a gap
Result
|
Proceed to
|
Seats at less than -35 kPa (-263 mmHg) negative pressure
|
A
|
Seats at -35 kPa (-263 mmHg) or greater negative pressure
|
B
|
Waste gate valve does not move
|
C
|
A
|
|
|
4.
|
CHECK TURBOCHARGER SUB-ASSEMBLY (INSPECT WASTE GATE VALVE)
|
(a) Check for play in the waste gate valve and waste gate valve link.
Standard:
Play exists
HINT:
Some play is required as the waste gate valve link slides. If no play exists, the valve is determined to be stuck.
(b) Close the waste gate valve and using a feeler gauge, measure the clearance between the waste gate valve and the contact surface of the valve port of the turbine with valve housing sub-assembly waste gate.
Standard:
0.15 mm (0.0059 in.) or less
OK
|
|
|
5.
|
CHECK TURBOCHARGER SUB-ASSEMBLY (INSPECT AIR BY-PASS VALVE ASSEMBLY)
|
(a) Inspect the air by-pass valve assembly.
Click here
6.
|
CHECK CYLINDER HEAD SUB-ASSEMBLY
|
(a) Check for deformation or cracks in the mounting surfaces on the cylinder head sub-assy and the turbocharger sub-assembly.
HINT:
Deformation or cracks on a mounting surface may allow exhaust gas to leak from the damaged position.
Standard:
No deformation or cracks on a mounting surface
Result
|
Proceed to
|
No problem with the mounting surface
|
A
|
Deformation or cracks on the cylinder head sub-assy mounting surface
|
B
|
Deformation or cracks on the turbocharger sub-assembly mounting surface
|
C
|
A
|
|
|
(a) Replace the gasket between the cylinder head sub-assy and turbocharger sub-assembly.
NEXT
|
|
|
8.
|
PERFORM SIMULATION TEST
|
(a) Check that the abnormal state has disappeared.
NEXT |
|
END
|
9.
|
CHECK TURBOCHARGER SUB-ASSEMBLY (INSPECT TURBINE HOUSING)
|
(a) Check that the bushing of the turbine housing waste gate valve link is free of cracks.
(b) Close the waste gate valve and using a feeler gauge, measure the clearance between the waste gate valve and the contact surface of the valve port of the turbine with valve housing sub-assembly waste gate.
Standard:
No cracks and play does not exceed 0.15 mm (0.0059 in.)
|