Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM100000001N36V |
Model Year Start: 2021 |
Model: Corolla |
Prod Date Range: [04/2020 - 09/2022] |
Title: HYBRID / BATTERY CONTROL: HV BATTERY STACK (for LITHIUM-ION BATTERY): INSTALLATION; 2021 - 2022 MY Corolla Corolla HV [04/2020 - 09/2022] |
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 HV SUPPLY STACK SUB-ASSEMBLY
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the No. 2 HV supply stack sub-assembly with the 4 nuts.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(b) Engage the claw.
2. INSTALL NO. 1 HV SUPPLY STACK SUB-ASSEMBLY
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the No. 1 HV supply stack sub-assembly with the 4 nuts.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(b) Engage the claw.
(c) Connect the connector.
NOTICE:
Make sure that the connector is connected securely.
(d) Connect the connector.
NOTICE:
Make sure that the connector is connected securely.
3. INSTALL NO. 2 HV BATTERY PROTECTOR
Click here
4. INSTALL BATTERY ECU ASSEMBLY
Click here
5. INSTALL NO. 1 HV BATTERY PROTECTOR
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Engage the 2 claws to install the No. 1 HV battery protector to the No. 2 HV battery protector.
(b) Install the 3 nuts.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(c) Engage the clamp to connect the wire harness.
6. INSTALL NO. 1 HYBRID BATTERY SHIELD SUB-ASSEMBLY
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the No. 1 hybrid battery shield sub-assembly to the HV battery with the nut.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
(b) Engage the clamp.
7. INSTALL NO. 1 HV BATTERY HOSE
Click here
8. INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Install the No. 1 hybrid battery intake duct to the HV battery with the clip.
(b) Engage the claw of hybrid battery thermistor (sensor portion) to connect the No. 1 hybrid battery intake duct.
9. INSTALL HYBRID BATTERY TERMINAL BLOCK
Click here
10. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY WITH NO. 2 HYBRID BATTERY SHIELD SUB-ASSEMBLY
Click here
11. INSTALL UPPER NO. 1 HYBRID BATTERY COVER SUB-ASSEMBLY
Click here
12. INSTALL HV BATTERY
Click here
13. PERFORM INITIALIZATION
Click here
|