Last Modified: 05-13-2024 6.11:8.1.0 Doc ID: RM100000001GW9A
Model Year Start: 2020 Model: GR Corolla Prod Date Range: [01/2019 -           ]
Title: HEATING / AIR CONDITIONING: RELAY: ON-VEHICLE INSPECTION; 2020 - 2025 MY Corolla Corolla Hatchback Corolla HV GR Corolla [01/2019 -        ]

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT PTC HEATER NO. 1 RELAY

*a

PTC Heater No. 1 Relay

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Auxiliary battery voltage applied between terminal 1 and 2

Below 1 Ω

3 - 5

Auxiliary battery voltage not applied between terminal 1 and 2

10 kΩ or higher

  • If the result is not as specified, replace the PTC heater No. 1 relay.

2. INSPECT PTC HEATER NO. 2 RELAY

*a

PTC Heater No. 2 Relay

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Battery voltage applied between terminal 1 and 2

Below 1 Ω

3 - 5

Battery voltage not applied between terminal 1 and 2

10 kΩ or higher

If the result is not as specified, replace the PTC heater No. 2 relay.

3. INSPECT PTC HEATER NO. 3 RELAY

*a

PTC Heater No. 3 Relay

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Battery voltage applied between terminal 1 and 2

Below 1 Ω

3 - 5

Battery voltage not applied between terminal 1 and 2

10 kΩ or higher

If the result is not as specified, replace the PTC heater No. 3 relay.