Last Modified: 07-31-2024 6.11:8.1.0 Doc ID: RM100000001GMI1
Model Year Start: 2020 Model: Corolla Prod Date Range: [01/2019 -           ]
Title: 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: INSTALLATION; 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]

INSTALLATION

PROCEDURE

1. INSTALL WIRE HARNESS CLAMP BRACKET

(a) Install the wire harness clamp bracket to the timing chain cover assembly with the bolt.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

2. INSTALL IGNITION COIL ASSEMBLY

Click here 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]; 2ZR-FXE (ENGINE CONTROL): IGNITION COIL AND SPARK PLUG: INSTALLATION+

3. INSTALL VENTILATION HOSE

(a) Install the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.

4. INSTALL FUEL INJECTOR ASSEMBLY

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+

5. INSTALL NO. 1 DELIVERY PIPE SPACER

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+

6. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (FUEL): FUEL INJECTOR: INSTALLATION+

7. INSTALL FUEL VAPOR FEED PIPE

(a) Install the fuel vapor feed pipe to cylinder head cover sub-assembly with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

8. INSTALL PURGE VALVE (PURGE VSV)

Click here 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]; 2ZR-FXE (EMISSION CONTROL): PURGE VALVE: INSTALLATION+

9. INSTALL WATER BY-PASS PIPE

(a) Install the water by-pass pipe to the cylinder head sub-assembly with the 2 bolts.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(b) Connect the water by-pass pipe to the water inlet sub-assembly and slide the clip to secure it.

10. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

Click here 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]; 2ZR-FXE (COOLING): THERMOSTAT: INSTALLATION+

11. INSTALL ENGINE OIL LEVEL DIPSTICK

Click here 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]; 2ZR-FXE (COOLING): THERMOSTAT: INSTALLATION+

12. INSTALL INTAKE MANIFOLD

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+

13. CONNECT VENTILATION HOSE

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+

14. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+

15. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+

16. TEMPORARILY INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER

(a) Install a new EGR cooler gasket.

(b) Using an E8 "TORX" socket wrench, temporarily install the EGR valve assembly with EGR cooler with the 2 stud bolts.

Torque:

9.5 N·m {97 kgf·cm, 84 in·lbf}

(c) Temporarily install the bolt and 2 nuts.

Bolt

Nut

(d) Temporarily install 2 new nuts.

17. TEMPORARILY INSTALL EGR PIPE ASSEMBLY

(a) Install a new EGR pipe gasket and inlet EGR gasket.

(b) Temporarily install the EGR pipe assembly with the 4 bolts.

18. INSTALL EGR VALVE ASSEMBLY WITH EGR COOLER

(a) Tighten the bolt and 4 nuts.

Torque:

Nut (A) :

21 N·m {214 kgf·cm, 15 ft·lbf}

Nut (B) :

26 N·m {265 kgf·cm, 19 ft·lbf}

Bolt :

21 N·m {214 kgf·cm, 15 ft·lbf}

Bolt

Nut

19. INSTALL EGR PIPE ASSEMBLY

(a) Tighten the 4 bolts.

Torque:

8.5 N·m {87 kgf·cm, 75 in·lbf}

20. INSTALL WATER OUTLET

(a) Install the water outlet and a new water outlet gasket to the cylinder head sub-assembly with the 2 nuts.

Torque:

28 N·m {286 kgf·cm, 21 ft·lbf}

(b) Connect the No. 9 water by-pass hose to the purge valve and slide the clip to secure it.

(c) Connect the No. 4 water by-pass hose to the EGR valve assembly with EGR cooler and slide the clip to secure it.