Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM100000001GLNX |
Model Year Start: 2020 |
Model: Corolla |
Prod Date Range: [01/2019 - 09/2022] |
Title: 2ZR-FAE (BATTERY / CHARGING): GENERATOR: INSTALLATION; 2020 - 2022 MY Corolla [01/2019 - 09/2022] |
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp bracket with the bolt.
Torque:
8.4 N·m {86 kgf·cm, 74 in·lbf}
(b) Install the generator assembly with the 2 bolts.
Torque:
Bolt (A) :
25 N·m {255 kgf·cm, 18 ft·lbf}
Bolt (B) :
43 N·m {438 kgf·cm, 32 ft·lbf}
|
|
(c) Engage the wire harness clamp.
(d) Connect the generator assembly connector.
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Install the terminal cap.
2. INSTALL V-RIBBED BELT
Click here
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
|