Last Modified: 05-13-2024 6.11:8.1.0 Doc ID: RM100000001GLN4
Model Year Start: 2020 Model: Corolla Prod Date Range: [01/2019 -           ]
Title: 2ZR-FXE (LUBRICATION): OIL PUMP: INSTALLATION; 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]

INSTALLATION

PROCEDURE

1. INSTALL OIL PUMP ASSEMBLY

(a) Install the oil pump assembly to the stiffening crankcase assembly with the 3 bolts.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

2. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+

3. INSTALL NO. 2 CHAIN SUB-ASSEMBLY

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+

4. INSTALL CRANKSHAFT TIMING SPROCKET

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+

5. SET NO. 1 CYLINDER TO TDC (COMPRESSION)

Click here 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+ 2023 - 2025 MY Corolla Corolla HV [09/2022 -        ]; 2ZR-FXE (ENGINE MECHANICAL): ENGINE UNIT: REASSEMBLY+

6. INSTALL CHAIN SUB-ASSEMBLY

Click here 2020 - 2025 MY Corolla Corolla HV [01/2019 -        ]; 2ZR-FXE (ENGINE MECHANICAL): CYLINDER HEAD GASKET: INSTALLATION