Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM100000001GFQJ |
Model Year Start: 2020 |
Model: Corolla |
Prod Date Range: [01/2019 - 09/2022] |
Title: 2ZR-FXE (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION; 2020 - 2022 MY Corolla Corolla HV [01/2019 - 09/2022] |
INSTALLATION
PROCEDURE
1. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 2 exhaust manifold heat insulator to the exhaust manifold (TWC: Front Catalyst) with the 4 bolts.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
2. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)
(a) Install a new exhaust manifold to head gasket and EGR cooler gasket to the cylinder head sub-assembly.
(b) Temporarily install the exhaust manifold (TWC: Front Catalyst) to the cylinder head sub-assembly with 7 new nuts.
(c) Temporarily install the manifold stay to the exhaust manifold (TWC: Front Catalyst) and cylinder block sub-assembly with the 3 bolts.
(d) Using a 12 mm deep socket wrench, tighten the 7 nuts in the order shown in the illustration.
Torque:
26 N·m {265 kgf·cm, 19 ft·lbf}
|
|
(e) Tighten the 3 bolts in the order shown in the illustration.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
|
|
3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 1 exhaust manifold heat insulator to the exhaust manifold (TWC: Front Catalyst) with the 6 bolts.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
4. INSTALL WIRING HARNESS CLAMP BRACKET
(a) Install the wiring harness clamp bracket to the engine assembly with the bolt and engage the clamp.
Torque:
39 N·m {398 kgf·cm, 29 ft·lbf}
5. CONNECT FLOOR SHIFT TRANSMISSION CONTROL SELECT CABLE
(a) Connect the floor shift transmission control select cable to the engine assembly with the bolt.
Torque:
12 N·m {122 kgf·cm, 9 ft·lbf}
6. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Click here
7. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
(a) Using a vernier caliper, measure the free length of the compression springs.
Minimum Free Length (Front)
|
41.5 mm (1.63 in.)
|
Minimum Free Length (Rear)
|
38.5 mm (1.52 in.)
|
If the free length is less than the minimum, replace the compression spring.
|
|
(b) Temporarily install 2 new gaskets to the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst).
(c) Using a plastic hammer and wooden block, tap in each gasket until its surface is flush with the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst).
NOTICE:
-
Be sure to install the gasket in the correct direction.
-
Do not reuse the gaskets.
-
Do not damage the gaskets.
-
Do not push in the gaskets by using the exhaust pipes when connecting them.
|
|
*1
|
Exhaust Manifold (TWC: Front Catalyst) or Front Exhaust Pipe Assembly (TWC: Rear Catalyst)
|
*2
|
Gasket
|
*a
|
Wooden Block
|
|
|
(d) Connect the front exhaust pipe assembly (TWC: Rear Catalyst) to the 2 exhaust pipe supports.
(e) Install the front exhaust pipe assembly (TWC: Rear Catalyst) to the exhaust manifold (TWC: Front Catalyst) with the 2 compression springs and 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
HINT:
After installation, check that the space between the flanges of the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst) is consistent front-to-rear and left-to-right.
*1
|
Exhaust Manifold (TWC: Front Catalyst)
|
*2
|
Front Exhaust Pipe Assembly (TWC: Rear Catalyst)
|
*3
|
Gasket
|
*a
|
Space between Flanges: 8.5 mm (0.335 in.)
|
(f) Install the front exhaust pipe assembly (TWC: Rear Catalyst) to the tail exhaust pipe assembly with the 2 compression springs and 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
HINT:
After installation, check that the space between the flanges of the front exhaust pipe assembly (TWC: Rear Catalyst) and tail exhaust pipe assembly is consistent front-to-rear and left-to-right.
*1
|
Front Exhaust Pipe Assembly (TWC: Rear Catalyst)
|
*2
|
Tail Exhaust Pipe Assembly
|
*3
|
Gasket
|
*a
|
Space between Flanges: 6.5 mm (0.256 in.)
|
(g) Engage the wire harness clamp.
(h) Connect the heated oxygen sensor connector.
8. INSTALL FRONT FLOOR CENTER BRACE
(a) Install the 3 front floor center braces to the vehicle body with the 12 bolts.
Torque:
29 N·m {296 kgf·cm, 21 ft·lbf}
9. INSTALL FRONT FLOOR COVER LH
(a) Engage the 6 clamps to install the front floor cover LH to the vehicle body with the 2 bolts and 3 clips.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
10. INSTALL FRONT FLOOR COVER RH
HINT:
Perform the same procedure as for the front floor cover LH.
11. INSTALL AIR FUEL RATIO SENSOR
Click here
12. INSPECT FOR EXHAUST GAS LEAK
Click here
13. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Click here
|