Last Modified: 07-31-2024 6.11:8.1.0 Doc ID: RM100000001D0LU
Model Year Start: 2019 Model: Corolla Hatchback Prod Date Range: [06/2018 -           ]
Title: K120 / K121 (CVT): K120 PARK / NEUTRAL POSITION SWITCH: INSPECTION; 2019 - 2025 MY Corolla Corolla Hatchback [06/2018 -        ]

INSPECTION

PROCEDURE

1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

2 (RB) - 6 (PL)

Shift lever in P

Below 1 Ω

Shift lever not in P

10 kΩ or higher

2 (RB) - 1 (RL)

Shift lever in R

Below 1 Ω

Shift lever not in R

10 kΩ or higher

2 (RB) - 9 (NL)

Shift lever in N

Below 1 Ω

Shift lever not in N

10 kΩ or higher

2 (RB) - 7 (DL)

Shift lever in D, M, "+" or "-"

Below 1 Ω

Shift lever not in D, M, "+" or "-"

10 kΩ or higher

If the result is not as specified, replace the park/neutral position switch assembly.

*a

Component without harness connected

(Park/Neutral Position Switch assembly)