|
Last Modified: 08-22-2025 |
6.11:8.1.0 |
Doc ID: RM100000001CPXN |
|
Model Year Start: 2019 |
Model: Corolla Hatchback |
Prod Date Range: [06/2018 - 09/2022] |
|
Title: METER / GAUGE / DISPLAY: HEADUP DISPLAY: INSTALLATION; 2019 - 2022 MY Corolla Corolla Hatchback Corolla HV [06/2018 - 09/2022] |
INSTALLATION
PROCEDURE
1. INSTALL METER MIRROR SUB-ASSEMBLY
(a) Install the meter mirror sub-assembly with 3 new bolts.
(b) Connect the connector.
2. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Click here
|