Last Modified: 07-31-2024 |
6.11:8.1.0 |
Doc ID: RM100000001BGXV |
Model Year Start: 2019 |
Model: Corolla Hatchback |
Prod Date Range: [06/2018 - 01/2019] |
Title: M20A-FKS (ENGINE CONTROL): SFI SYSTEM: P062714; Fuel Pump "A" Control Circuit Short to Ground or Open; 2019 MY Corolla Corolla Hatchback [06/2018 - 01/2019] |
DTC
|
P062714
|
Fuel Pump "A" Control Circuit Short to Ground or Open
|
DESCRIPTION
Refer to DTC P062712.
Click here
DTC No.
|
Detection Item
|
DTC Detection Condition
|
Trouble Area
|
MIL
|
Memory
|
Note
|
P062714
|
Fuel Pump "A" Control Circuit Short to Ground or Open
|
When the fuel pump control ECU operation duty ratio is 3 to 65%, the FPC terminal voltage is a certain value or less for 3 seconds or more (1 trip detection logic).
|
-
Open or short in fuel pump control ECU circuit
-
Fuel pump control ECU
-
EFI-MAIN NO. 2 relay
-
ECM
|
Comes on
|
DTC stored
|
SAE Code: P0628
|
Related Data List
DTC No.
|
Data List
|
P062714
|
Fuel Pump Control Duty Ratio
|
MONITOR DESCRIPTION
The ECM monitors the fuel pump control ECU operation signals.
When the output duty ratio of the operation signal from the ECM is 3 to 65% and the FPC terminal voltage is a certain value or less for 3 seconds or more, the ECM stores a DTC.
MONITOR STRATEGY
Related DTCs
|
P0628: Fuel pump control circuit range check (low voltage)
|
Required Sensors/Components (Main)
|
Fuel pump control ECU
|
Required Sensors/Components (Related)
|
-
|
Frequency of Operation
|
Continuous
|
Duration
|
3 seconds
|
MIL Operation
|
Immediate
|
Sequence of Operation
|
None
|
TYPICAL ENABLING CONDITIONS
Monitor runs whenever the following DTCs are not stored
|
None
|
All of the following conditions are met
|
-
|
Output duty cycle
|
3 to 65%
|
Battery voltage
|
10.5 V or higher
|
Engine switch
|
on (IG)
|
Starter
|
Off
|
TYPICAL MALFUNCTION THRESHOLDS
Fuel pump control module terminal voltage level
|
Low for 1.163264 seconds or more
|
CONFIRMATION DRIVING PATTERN
HINT:
-
After repair has been completed, clear the DTC and then check that the vehicle has returned to normal by performing the following All Readiness check procedure.
Click here
-
When clearing the permanent DTCs, refer to the "CLEAR PERMANENT DTC" procedure.
Click here
-
Connect the Techstream to the DLC3.
-
Turn the engine switch on (IG).
-
Turn the Techstream on.
-
Clear the DTCs (even if no DTCs are stored, perform the clear DTC procedure).
-
Turn the engine switch off and wait for at least 30 seconds.
-
Start the engine and wait 10 seconds or more [A].
-
Turn the Techstream on.
-
Enter the following menus: Powertrain / Engine / Trouble Codes [B].
-
Read the pending DTCs.
HINT:
-
If a pending DTC is output, the system is malfunctioning.
-
If a pending DTC is not output, perform the following procedure.
-
Enter the following menus: Powertrain / Engine / Utility / All Readiness.
-
Input the DTC: P062714.
-
Check the DTC judgment result.
Techstream Display
|
Description
|
NORMAL
|
-
DTC judgment completed
-
System normal
|
ABNORMAL
|
-
DTC judgment completed
-
System abnormal
|
INCOMPLETE
|
-
DTC judgment not completed
-
Perform driving pattern after confirming DTC enabling conditions
|
WIRING DIAGRAM
Refer to DTC P062712.
Click here
CAUTION / NOTICE / HINT
NOTICE:
Inspect the fuses for circuits related to this system before performing the following procedure.
HINT:
Read Freeze Frame Data using the Techstream. The ECM records vehicle and driving condition information as Freeze Frame Data the moment a DTC is stored. When troubleshooting, Freeze Frame Data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, if the air fuel ratio was lean or rich, and other data from the time the malfunction occurred.
PROCEDURE
1.
|
CHECK HARNESS AND CONNECTOR (POWER SOURCE OF FUEL PUMP CONTROL ECU)
|
*a
|
Front view of wire harness connector
(to Fuel Pump Control ECU)
|
(a) Disconnect the fuel pump control ECU connector.
(b) Turn the engine switch on (IG).
(c) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
|
Condition
|
Specified Condition
|
O66-1 (+B) - O66-3 (GND)
|
Engine switch on (IG)
|
11 to 14 V
|
OK
|
|
|
2.
|
INSPECT ECM (FPC TERMINAL)
|
*a
|
Front view of wire harness connector
(to Fuel Pump Control ECU)
|
(a) Disconnect the fuel pump control ECU connector.
(b) Connect the Techstream to the DLC3.
(c) Turn the engine switch on (IG).
(d) Turn the Techstream on.
(e) Enter the following menus: Powertrain / Engine / Active Test / Fuel Pump Single Phase Energization.
Powertrain > Engine > Active Test
Tester Display
|
Fuel Pump Single Phase Energization
|
(f) Operate the fuel pump control ECU using the Active Test function and measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Techstream Operation
|
Specified Condition
|
O66-2 (FPC) - Body ground
|
Before Active Test → During Active Test
|
Before Active Test: Resistance is stable → During Active Test: Resistance fluctuates*
|
HINT:
*: Using the Active Test, duty control of the transistors in the ECM will be performed. Due to the duty control, resistance of the FPC terminal will be unstable during the Active Test. If the resistance is stable before the Active Test and fluctuates while performing the Active Test, it can be determined that the transistor is operating. If the transistor does not operate during the Active Test, the ECM may be malfunctioning.
NG
|
|
|
3.
|
CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - ECM)
|
(a) Disconnect the fuel pump control ECU connector.
(b) Disconnect the ECM connector.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
O66-2 (FPC) - A47-6 (FPC)
|
Always
|
Below 1 Ω
|
O66-2 (FPC) or A47-6 (FPC) - Body ground
|
Always
|
10 kΩ or higher
|
NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
4.
|
CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - BODY GROUND)
|
(a) Disconnect the fuel pump control ECU connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
O66-3 (GND) - Body ground
|
Always
|
Below 1 Ω
|
NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
OK
|
|
|
5.
|
INSPECT EFI-MAIN NO. 2 RELAY
|
(a) Inspect the EFI-MAIN NO. 2 relay.
Click here
NG |
|
REPLACE EFI-MAIN NO. 2 RELAY
|
OK
|
|
|
6.
|
CHECK TERMINAL VOLTAGE (POWER SOURCE OF EFI-MAIN NO. 2 RELAY)
|
*1
|
No. 1 Engine Room Relay Block and No. 1 Junction Block Assembly
|
*2
|
EFI-MAIN NO. 2 Relay
|
(a) Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
|
Condition
|
Specified Condition
|
5 (EFI-MAIN NO. 2 relay) - Body ground
|
Always
|
11 to 14 V
|
NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - EFI-MAIN NO. 2 RELAY)
|
OK
|
|
|
7.
|
CHECK HARNESS AND CONNECTOR (EFI-MAIN NO. 2 RELAY - BODY GROUND)
|
(a) Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
2 (EFI-MAIN NO. 2 relay) - Body ground
|
Always
|
Below 1 Ω
|
NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
OK
|
|
|
8.
|
CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - EFI-MAIN NO. 2 RELAY)
|
(a) Disconnect the fuel pump control ECU connector.
(b) Remove the EFI-MAIN NO. 2 relay from the No. 1 engine room relay block and No. 1 junction block assembly.
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
O66-1 (+B) - 3 (EFI-MAIN NO. 2 relay)
|
Always
|
Below 1 Ω
|
O66-1 (+B) or 3 (EFI-MAIN NO. 2 relay) - Body ground and other terminals
|
Always
|
10 kΩ or higher
|
OK |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - EFI-MAIN NO. 2 RELAY)
|
NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR
|
|