Last Modified: 01-30-2024 6.11:8.1.0 Doc ID: RM1000000021JWC
Model Year Start: 2022 Model: RAV4 HV Prod Date Range: [12/2021 -           ]
Title: A25A-FXS (ENGINE MECHANICAL): ENGINE UNIT: INSTALLATION; 2022 - 2024 MY RAV4 HV [12/2021 -        ]

INSTALLATION

CAUTION / NOTICE / HINT

NOTICE:

This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.

Click here 2019 - 2024 MY RAV4 RAV4 HV [11/2018 -        ]; INTRODUCTION: REPAIR INSTRUCTION: PRECAUTION

PROCEDURE

1. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR

(a) Install the No. 3 exhaust manifold heat insulator to the cylinder block sub-assembly with the bolt.

Torque:

16 N·m {163 kgf·cm, 12 ft·lbf}

2. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

(a) Apply a light coat of engine oil to a new O-ring.

(b) Install the O-ring to the engine oil level dipstick guide.

(c) Using an 8 mm socket wrench, install the engine oil level dipstick guide to the cylinder head sub-assembly with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(d) Install the engine oil level dipstick.

3. INSTALL IGNITION COIL ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (ENGINE CONTROL): IGNITION COIL AND SPARK PLUG: INSTALLATION+

4. INSTALL FUEL INJECTOR SEAL

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Direct Injection): INSTALLATION+

5. INSTALL DIRECT FUEL INJECTOR ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Direct Injection): INSTALLATION+

6. INSTALL FUEL DELIVERY PIPE

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Direct Injection): INSTALLATION+

7. INSTALL PORT FUEL INJECTOR ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

8. INSTALL NO. 5 ENGINE WIRE

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

9. INSTALL INJECTOR VIBRATION INSULATOR

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

10. INSTALL NO. 1 DELIVERY PIPE SPACER

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

11. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

12. INSTALL WIRE HARNESS CLAMP BRACKET

(a) Using an 8 mm socket wrench, install the wire harness clamp bracket to the No. 1 ventilation case with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

13. INSTALL NO. 6 ENGINE WIRE

(a) Install the No. 6 engine wire to the wire harness clamp bracket with the 2 nuts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(b) Attach the 2 clamps.

(c) Connect the 4 connectors.

14. INSTALL SENSOR WIRE

(a) Using an 8 mm socket wrench, install the sensor wire to the water inlet with thermostat sub-assembly with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(b) Attach the 3 clamps.

(c) Connect the 4 connectors.

15. INSTALL NO. 7 WATER BY-PASS HOSE

(a) Install the No. 7 water by-pass hose and slide the 2 clips to secure them.

16. TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL PUMP (for High Pressure): INSTALLATION+

17. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL PUMP (for High Pressure): INSTALLATION+

18. INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL PUMP (for High Pressure): INSTALLATION+

19. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

(a) Using a 17 mm union nut wrench, tighten the union nut on the fuel delivery pipe side of the No. 1 fuel pipe sub-assembly.

Torque:

Specified tightening torque :

35 N·m {357 kgf·cm, 26 ft·lbf}

NOTICE:

Do not adjust the torque in the loosening direction.

HINT:

  • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

    Click here 2019 - 2024 MY RAV4 RAV4 HV [11/2018 -        ]; INTRODUCTION: REPAIR INSTRUCTION: PRECAUTION

  • When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)

*a

17 mm Union Nut Wrench

*b

Torque Wrench Fulcrum Length

Union Nut

Bolt

(b) Using a 17 mm union nut wrench, tighten the union nut on the fuel pump assembly side of the No. 1 fuel pipe sub-assembly.

Torque:

Specified tightening torque :

35 N·m {357 kgf·cm, 26 ft·lbf}

NOTICE:

Do not adjust the torque in the loosening direction.

HINT:

  • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

    Click here 2019 - 2024 MY RAV4 RAV4 HV [11/2018 -        ]; INTRODUCTION: REPAIR INSTRUCTION: PRECAUTION

  • When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)

(c) Connect the No. 1 fuel pipe sub-assembly to the cylinder head sub-assembly with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

20. CONNECT FUEL TUBE SUB-ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (FUEL): FUEL PUMP (for High Pressure): INSTALLATION+

21. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET

Click here 2019 - 2024 MY RAV4 HV [11/2018 -        ]; A25A-FXS (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+

22. INSTALL INTAKE MANIFOLD

Click here 2019 - 2024 MY RAV4 HV [11/2018 -        ]; A25A-FXS (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION+

23. INSTALL NO. 2 WATER BY-PASS PIPE

(a) Install the bolt (A).

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(b) Using an 8 mm socket wrench, install the No. 2 water by-pass pipe with the 2 bolts (B) in the order shown in the illustration.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

24. INSTALL NO. 3 WATER BY-PASS PIPE

(a) Connect the No. 3 water by-pass pipe to the water outlet and slide the clip to secure it.

(b) Using an 8 mm socket wrench, install the No. 3 water by-pass pipe to the intake manifold with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

25. SET EGR VALVE ASSEMBLY

(a) Set the EGR valve assembly to the camshaft housing.

HINT:

At this time, do not install the parts with bolts.

26. INSTALL NO. 4 WATER BY-PASS HOSE

(a) Connect the No. 4 water by-pass hose to the EGR valve assembly and slide the clip to secure it.

27. INSTALL EGR COOLER ASSEMBLY

(a) Install a new EGR cooler gasket to the EGR cooler assembly.

NOTICE:

Make sure that the claws of the EGR cooler gasket are toward the EGR cooler assembly side.

*a

Claw

(b) Install a new EGR valve gasket to the EGR cooler assembly.

NOTICE:

Make sure that the claws of the EGR valve gasket are toward the EGR cooler assembly side.

(c) Type A:

(1) Temporarily install the EGR cooler assembly to the cylinder head sub-assembly and EGR valve assembly with the 2 bolts and 3 nuts.

Bolt

Nut

(2) Tighten the 2 bolts and 3 nuts in the order shown in the illustration.

Torque:

24 N·m {245 kgf·cm, 18 ft·lbf}

(d) Type B:

Bolt

Nut

(1) Temporarily install the EGR cooler assembly to the cylinder head sub-assembly and EGR valve assembly with the 3 bolts and 2 nuts.

(2) Tighten the 3 bolts and 2 nuts in the order shown in the illustration.

Torque:

24 N·m {245 kgf·cm, 18 ft·lbf}

(e) Connect the No. 3 water by-pass hose to the EGR cooler assembly and slide the clip to secure it.

(f) Connect the No. 4 water by-pass hose to the EGR cooler assembly and slide the clip to secure it.

28. INSTALL EGR VALVE ASSEMBLY

(a) Using an 8 mm socket wrench, install the EGR valve assembly to the camshaft housing sub-assembly with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(b) Connect the No. 8 water by-pass hose to the EGR valve assembly and slide the clip to secure it.

29. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

Click here 2022 - 2024 MY RAV4 HV [12/2021 -        ]; A25A-FXS (EMISSION CONTROL): EGR VALVE: INSTALLATION+

30. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (ENGINE CONTROL): THROTTLE BODY: INSTALLATION+

31. INSTALL EXHAUST MANIFOLD

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+

32. INSTALL MANIFOLD STAY

Click here 2021 - 2024 MY RAV4 HV [08/2020 -        ]; A25A-FXS (INTAKE / EXHAUST): EXHAUST MANIFOLD: INSTALLATION+

33. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

(a) for Type A:

(1) Install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 3 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(b) for Type B:

(1) Install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 5 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

34. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)

(a) Install the water hose clamp bracket with the 2 bolts as shown in the illustration.

Torque:

13 N·m {133 kgf·cm, 10 ft·lbf}

NOTICE:

Temporarily install the bolt (A), and then tighten the 2 bolts in the order of (B) and (A).

(b) Connect the flow shutting valve (water by-pass hose assembly) to the water by-pass outlet sub-assembly and slide the clip to secure it.

NOTICE:

  • Make sure to slide the flow shutting valve (water by-pass hose assembly) until it contacts the hose stopper of the water by-pass outlet sub-assembly.
  • Make sure that the claws of the clip are within the location shown in the illustration.

*a

Paint Mark

*b

90° (Claw of Clip Location)

(c) Connect the flow shutting valve (water by-pass hose assembly) with the bolt.

Torque:

19 N·m {194 kgf·cm, 14 ft·lbf}

35. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

(a) Connect the No. 2 water by-pass pipe sub-assembly with the bolt.

Torque:

19 N·m {194 kgf·cm, 14 ft·lbf}

(b) Connect the No. 2 water by-pass pipe sub-assembly to the outlet water by-pass sub-assembly and slide the clip to secure it.

36. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY

(a) Using an E8 "TORX" socket wrench, temporarily install the compressor assembly with pulley with the 2 stud bolts.

Torque:

5.0 N·m {51 kgf·cm, 44 in·lbf}

(b) Install the compressor assembly with pulley with the bolt and 2 nuts.

Bolt

Nut

Torque:

24.5 N·m {250 kgf·cm, 18 ft·lbf}

HINT:

Tighten the bolt and nuts in the order shown in the illustration.

37. INSTALL DRIVE SHAFT BEARING BRACKET

(a) Install the drive shaft bearing bracket with the 3 bolts.

Torque:

63.7 N·m {650 kgf·cm, 47 ft·lbf}