Last Modified: 01-30-2024 |
6.11:8.1.0 |
Doc ID: RM100000001PBUH |
Model Year Start: 2020 |
Model: RAV4 |
Prod Date Range: [06/2020 - 08/2020] |
Title: A25A-FKS (ENGINE MECHANICAL): ENGINE UNIT: INSTALLATION; 2020 MY RAV4 [06/2020 - 08/2020] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL NO. 2 VACUUM SWITCHING VALVE BRACKET
(a) Using an 8 mm socket wrench, install the No. 2 vacuum switching valve bracket to the cylinder head sub-assembly with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
2. INSTALL PURGE VALVE (PURGE VSV)
-
w/ Canister Pump Module:
Click here
-
w/o Canister Pump Module:
Click here
3. INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 3 exhaust manifold heat insulator to the cylinder block sub-assembly with the bolt.
Torque:
16 N·m {163 kgf·cm, 12 ft·lbf}
4. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
(a) Apply a light coat of engine oil to a new O-ring.
(b) Install the O-ring to the engine oil level dipstick guide.
(c) Using an 8 mm socket wrench, install the engine oil level dipstick guide to the cylinder head sub-assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(d) Install the engine oil level dipstick.
5. INSTALL IGNITION COIL ASSEMBLY
Click here
6. INSTALL FUEL INJECTOR SEAL
Click here
7. INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Click here
8. INSTALL FUEL DELIVERY PIPE
Click here
9. INSTALL PORT FUEL INJECTOR ASSEMBLY
Click here
10. INSTALL NO. 5 ENGINE WIRE
Click here
11. INSTALL INJECTOR VIBRATION INSULATOR
Click here
12. INSTALL NO. 1 DELIVERY PIPE SPACER
Click here
13. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Click here
14. INSTALL WIRE HARNESS CLAMP BRACKET
(a) Using an 8 mm socket wrench, install the wire harness clamp bracket to the No. 1 ventilation case with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
15. INSTALL NO. 6 ENGINE WIRE
(a) Install the No. 6 engine wire to the wire harness clamp bracket with the 2 nuts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Attach the 2 clamps.
(c) Connect the 4 connectors.
16. INSTALL SENSOR WIRE
(a) Using an 8 mm socket wrench, install the sensor wire to the water inlet with thermostat sub-assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Attach the 3 clamps.
(c) Connect the 4 connectors.
17. INSTALL NO. 7 WATER BY-PASS HOSE
(a) Install the No. 7 water by-pass hose and slide the 2 clips to secure it.
18. TEMPORARILY INSTALL FUEL PUMP ASSEMBLY (for High Pressure)
Click here
19. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Click here
20. INSTALL FUEL PUMP ASSEMBLY (for High Pressure)
Click here
21. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
(a) Using a 17 mm union nut wrench, tighten the union nut on the fuel delivery pipe side of the No. 1 fuel pipe sub-assembly.
Torque:
Specified tightening torque :
35 N·m {357 kgf·cm, 26 ft·lbf}
NOTICE:
Do not adjust the torque in the loosening direction.
HINT:
-
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click here
-
When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)
|
|
*a
|
17 mm Union Nut Wrench
|
*b
|
Torque Wrench Fulcrum Length
|
|
|
(b) Using a 17 mm union nut wrench, tighten the union nut on the fuel pump assembly side of the No. 1 fuel pipe sub-assembly.
Torque:
Specified tightening torque :
35 N·m {357 kgf·cm, 26 ft·lbf}
NOTICE:
Do not adjust the torque in the loosening direction.
HINT:
-
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click here
-
When using a 17 mm union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)
22. CONNECT FUEL TUBE SUB-ASSEMBLY
Click here
23. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
Click here
24. INSTALL INTAKE MANIFOLD
Click here
25. INSTALL NO. 2 WATER BY-PASS PIPE
(a) Install the bolt (A).
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
|
|
(b) Using an 8 mm socket wrench, install the No. 2 water by-pass pipe with the 2 bolts (B) in the order shown in the illustration.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
26. INSTALL NO. 3 WATER BY-PASS PIPE
(a) Connect the No. 3 water by-pass pipe to the water outlet and slide the clip to secure it.
(b) Using an 8 mm socket wrench, install the No. 3 water by-pass pipe to the intake manifold with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
27. INSTALL EGR VALVE ASSEMBLY
(a) Using an 8 mm socket wrench, install the EGR valve bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Align and fit the hole of the EGR valve bracket to the pin of the camshaft housing sub-assembly.
|
|
(c) Using an 8 mm socket wrench, install the EGR valve assembly with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(d) Connect the No. 8 water by-pass hose to the EGR valve assembly and slide the clip to secure it.
(e) Connect the clamp.
28. INSTALL NO. 4 WATER BY-PASS HOSE
(a) Connect the No. 4 water by-pass hose to the EGR valve assembly and slide the clip to secure it.
29. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
(a) Using an 8 mm socket wrench, install the No. 1 EGR pipe sub-assembly, a new EGR inlet gasket and a new EGR valve adapter gasket with the 4 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
30. INSTALL NO. 1 EGR COOLER BRACKET
(a) Install the No. 1 EGR cooler bracket to the EGR valve bracket and water outlet with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
31. INSTALL EGR COOLER ASSEMBLY
(a) Install the EGR cooler assembly, a new EGR cooler gasket and a new EGR valve gasket with the 5 bolts.
Torque:
24 N·m {245 kgf·cm, 18 ft·lbf}
(b) Connect the No. 3 water by-pass hose to the EGR cooler assembly and slide the clip to secure it.
(c) Connect the water hose to the EGR cooler assembly and slide the clip to secure it.
32. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Click here
33. INSTALL EXHAUST MANIFOLD
Click here
34. INSTALL MANIFOLD STAY
Click here
35. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 5 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
36. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
(a) Connect the flow shutting valve (water by-pass hose assembly) to the water by-pass outlet sub-assembly and slide the clip to secure it.
NOTICE:
-
Make sure to slide the flow shutting valve (water by-pass hose assembly) until it contacts the hose stopper of the water by-pass outlet sub-assembly.
-
Make sure that the claws of the clip are within the location shown in the illustration.
|
|
*a
|
View A
|
*b
|
90°
|
*c
|
Upper Side
|
*d
|
RH Side
|
*e
|
2 to 7 mm (0.0787 to 0.276 in.)
|
|
|
(b) Install the water hose clamp bracket with the 2 bolts.
Torque:
13 N·m {133 kgf·cm, 10 ft·lbf}
(c) Connect the flow shutting valve (water by-pass hose assembly) with the bolt.
Torque:
19 N·m {194 kgf·cm, 14 ft·lbf}
37. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
(a) Connect the No. 2 water by-pass pipe sub-assembly with the bolt.
Torque:
19 N·m {194 kgf·cm, 14 ft·lbf}
(b) Connect the No. 2 water by-pass pipe sub-assembly to the outlet water by-pass sub-assembly and slide the clip to secure it.
38. INSTALL NO. 3 TIMING CHAIN COVER
(a) Using an 8 mm socket wrench, install the No. 3 timing chain cover and plate washer to the No. 2 timing chain cover assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
39. INSTALL TIMING GEAR COVER INSULATOR
(a) Using an 8 mm socket wrench, install the timing gear cover insulator and plate washer to the No. 2 timing chain cover assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
40. INSTALL NO. 2 TIMING CHAIN COVER INSULATOR
(a) Install the No. 2 timing chain cover insulator to the V-ribbed belt tensioner assembly.
41. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
NOTICE:
-
Do not apply or add any oil or grease to the belt tensioner to prevent abnormal noises from the belt tensioner pulley, belt squealing, etc.
-
Do not allow oil or grease to adhere to the moving parts of the belt tensioner, as this may cause malfunctions.
(a) Install the V-ribbed belt tensioner assembly to the No. 2 timing chain cover assembly with the 2 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf}
42. INSTALL NO. 2 ENGINE COVER
(a) Install the No. 2 engine cover to the No. 2 timing chain cover assembly with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
43. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY
(a) for Type A:
(1) Using an E8 "TORX" socket wrench, temporarily install the compressor assembly with pulley with the 2 stud bolts.
Torque:
5.0 N·m {51 kgf·cm, 44 in·lbf}
(2) Install the compressor assembly with pulley with the 2 bolts and 2 nuts.
|
Bolt
|
|
Nut
|
Torque:
24.5 N·m {250 kgf·cm, 18 ft·lbf}
HINT:
Tighten the bolts and nuts in the order shown in the illustration.
(b) for Type B:
(1) Install the compressor assembly with pulley with the 4 bolts.
Torque:
24.5 N·m {250 kgf·cm, 18 ft·lbf}
HINT:
Tighten the bolts in the order shown in the illustration.
|
|
44. INSTALL GENERATOR ASSEMBLY
-
for 100 A, 130 A Type:
Click here
-
for 150 A Type:
Click here
-
for VALEO Made:
Click here
45. INSTALL V-RIBBED BELT
Click here
46. INSTALL DRIVE SHAFT BEARING BRACKET
(a) Install the drive shaft bearing bracket with the 3 bolts.
Torque:
63.7 N·m {650 kgf·cm, 47 ft·lbf}
|