Last Modified: 01-30-2024 |
6.11:8.1.0 |
Doc ID: RM100000001FEMT |
Model Year Start: 2019 |
Model: RAV4 |
Prod Date Range: [11/2018 - 08/2020] |
Title: A25A-FKS (EMISSION CONTROL): EGR VALVE: INSTALLATION; 2019 - 2020 MY RAV4 [11/2018 - 08/2020] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL EGR VALVE ASSEMBLY
(a) Using an 8 mm socket wrench, install the EGR valve assembly to the EGR valve bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(b) Align and fit the hole of the EGR valve bracket to the pin of the camshaft housing.
|
|
(c) Using the 8 mm socket wrench, install the EGR valve assembly with the EGR valve bracket to the camshaft housing with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(d) Using the 8 mm socket wrench, connect the fuel pipe sub-assembly to the EGR valve bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Install the EGR cooler bracket to the EGR valve bracket and water outlet with the 2 bolts.
Torque:
24 N·m {245 kgf·cm, 18 ft·lbf}
(f) Install the No. 4 water by-pass hose to the EGR valve assembly and slide the clip to secure the hose.
(g) Connect the No. 8 water by-pass hose to the EGR valve assembly and slide the clip to secure it.
2. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
(a) Install a new EGR inlet gasket to the intake manifold.
(b) Install a new EGR valve adapter gasket to the No. 1 EGR pipe sub-assembly.
(c) Using an 8 mm socket wrench, install the No. 1 EGR pipe sub-assembly to the intake manifold and EGR valve assembly with the 4 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
3. CONNECT ENGINE WIRE
(a) Engage the 2 wire harness clamps to connect the engine wire.
|
|
*a
|
No. 5 Engine Wire Connector
|
*b
|
EGR Valve Assembly Connector
|
|
|
(b) Install the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(c) Connect the EGR valve assembly connector.
(d) Connect the No. 5 engine wire connector.
4. INSTALL EGR COOLER ASSEMBLY
Click here
5. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Click here
6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Click here
7. ADD ENGINE COOLANT
Click here
8. INSPECT FOR COOLANT LEAK
Click here
9. INSPECT FOR EXHAUST GAS LEAK
Click here
|