Last Modified: 01-30-2024 |
6.11:8.1.0 |
Doc ID: RM100000001EKTV |
Model Year Start: 2019 |
Model: RAV4 |
Prod Date Range: [11/2018 -
] |
Title: A25A-FKS (BATTERY / CHARGING): GENERATOR (for 100 A, 130 A Type): INSTALLATION; 2019 - 2024 MY RAV4 [11/2018 - ] |
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the bolt and 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(b) Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(c) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(d) Close the terminal cap.
(e) Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT
Click here
3. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
|