| 
                     
                        | Last Modified: 08-21-2023 | 6.11:8.1.0 | Doc ID: RM100000001XV41 |  
                        | Model Year Start: 2022 | Model: Avalon HV | Prod Date Range: [08/2021 -                    
                                       ] |  
                        | Title: EXTERIOR PANELS / TRIM: GRILLE SHUTTER: INSTALLATION; 2022 MY Avalon Avalon HV [08/2021 -        ] |  INSTALLATIONPROCEDURE1. INSTALL RADIATOR SHUTTER SUB-ASSEMBLY (a) Engage the 2 guides as shown in the illustration.   
                     
                        
                        
                     
                     
                        
                           |   | Install in this Direction |  (b) Install the radiator shutter sub-assembly with the 3 bolts. Torque:  5.5 N·m {56 kgf·cm, 49 in·lbf} (c) Connect the connector. 2. INSTALL THERMISTOR ASSEMBLY Click here
                        
                           
                              ![2019 - 2022 MY Avalon [04/2018 -        ]; HEATING / AIR CONDITIONING: AMBIENT TEMPERATURE SENSOR (for Gasoline Model): INSTALLATION+](/t3Portal/stylegraphics/info.gif)  3. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE LH (a) Engage the 2 claws to install the front radiator side air guide plate LH. 4. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE RH (a) Engage the 2 claws to install the front radiator side air guide plate RH. 5. INSTALL FRONT BUMPER ASSEMBLY Click here
                        
                           
                              ![2022 MY Avalon Avalon HV [08/2021 -        ]; EXTERIOR PANELS / TRIM: FRONT BUMPER: INSTALLATION](/t3Portal/stylegraphics/info.gif)  6.   INITIALIZATION GRILLE SHUTTER SYSTEM Click here
                        
                           
                              ![2022 MY Avalon HV [08/2021 -        ]; A25A-FXS (ENGINE CONTROL): SFI SYSTEM: INITIALIZATION](/t3Portal/stylegraphics/info.gif)  |