Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001QJNA
Model Year Start: 2021 Model: Avalon Prod Date Range: [08/2020 -           ]
Title: A25A-FKS (COOLING): FLOW SHUTTING VALVE (for ATF): INSPECTION; 2021 - 2022 MY Avalon [08/2020 -        ]

INSPECTION

PROCEDURE

1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

1 - 2

20°C (68°F)

22 to 28 Ω

If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose).