Last Modified: 08-21-2023 |
6.11:8.1.0 |
Doc ID: RM100000001PW7U |
Model Year Start: 2021 |
Model: Avalon |
Prod Date Range: [08/2020 -
] |
Title: A25A-FKS (EMISSION CONTROL): PCV VALVE: INSTALLATION; 2021 - 2022 MY Avalon [08/2020 - ] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
(a) Apply a light coat of engine oil to the O-ring.
NOTICE:
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
(b) Install the PCV valve (ventilation valve sub-assembly) to the cylinder head sub-assembly.
2. INSTALL INTAKE MANIFOLD
Click here
|