| 
                     
                        | Last Modified: 08-21-2023 | 6.11:8.1.0 | Doc ID: RM100000001PW7P |  
                        | Model Year Start: 2021 | Model: Avalon | Prod Date Range: [08/2020 -                    
                                       ] |  
                        | Title: A25A-FKS (EMISSION CONTROL): PURGE VALVE: INSTALLATION; 2021 - 2022 MY Avalon [08/2020 -        ] |  INSTALLATIONPROCEDURE1. INSTALL PURGE VALVE (PURGE VSV) 
                     
                        
                           | (a) Install the purge valve (purge VSV) to the purge VSV bracket with the bolt. Torque:  10 N·m {102 kgf·cm, 7 ft·lbf} | 
                                 
                                    |   |  
                                    | 
                                          
                                             
                                             
                                          
                                          
                                             
                                                | *1 | No. 1 Fuel Vapor Feed Hose |  
                                                | *2 | No. 2 Fuel Vapor Feed Hose |  
                                                | *a | Up |  
                                                | *b | Front |  
                                                | *c | 120° |  
                                                | *d | 2 to 7 mm (0.0787 to 0.276 in.) |  |  |  (b) Connect the No. 2 fuel vapor feed hose to the purge valve (purge VSV). (c) Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV) and slide the clip to secure it. HINT: Engage the clip within the area shown in the illustration. (d) Connect the purge valve (purge VSV) connector. |