Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001PTII
Model Year Start: 2021 Model: Avalon Prod Date Range: [08/2020 -           ]
Title: A25A-FKS (BATTERY / CHARGING): GENERATOR: INSTALLATION; 2021 - 2022 MY Avalon [08/2020 -        ]

INSTALLATION

PROCEDURE

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator assembly with the bolt and 2 nuts.

Torque:

25 N·m {255 kgf·cm, 18 ft·lbf}

(b) Engage the clamp.

(c) Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector.

(d) Install the wire harness clamp bracket to the generator assembly with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(e) Connect the wire harness to terminal B with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(f) Close the terminal cap.

(g) Connect the generator assembly connector.

2. INSTALL V-RIBBED BELT

Click here 2021 - 2022 MY Avalon [08/2020 -        ]; MAINTENANCE: A25A-FKS DRIVE BELT: INSTALLATION

3. INSTALL INLET AIR CLEANER ASSEMBLY

Click here 2021 - 2022 MY Avalon [08/2020 -        ]; A25A-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+

4. INSTALL COOL AIR INTAKE DUCT SEAL

Click here 2019 - 2021 MY Avalon Avalon HV [04/2018 - 08/2021]; EXTERIOR PANELS / TRIM: FRONT BUMPER: INSTALLATION+ 2022 MY Avalon Avalon HV [08/2021 -        ]; EXTERIOR PANELS / TRIM: FRONT BUMPER: INSTALLATION+

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Click here 2021 - 2022 MY Avalon [08/2020 -        ]; MAINTENANCE: A25A-FKS BATTERY: INSTALLATION+