Last Modified: 08-21-2023 |
6.11:8.1.0 |
Doc ID: RM100000001PTII |
Model Year Start: 2021 |
Model: Avalon |
Prod Date Range: [08/2020 -
] |
Title: A25A-FKS (BATTERY / CHARGING): GENERATOR: INSTALLATION; 2021 - 2022 MY Avalon [08/2020 - ] |
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the bolt and 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(b) Engage the clamp.
(c) Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector.
(d) Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Close the terminal cap.
(g) Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT
Click here
3. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
4. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
|