Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001PTIB
Model Year Start: 2021 Model: Avalon Prod Date Range: [08/2020 -           ]
Title: A25A-FKS (STARTING): RELAY: INSPECTION; 2021 - 2022 MY Avalon [08/2020 -        ]

INSPECTION

PROCEDURE

1. INSPECT ST RELAY

(a) Check the resistance.

(1) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Battery voltage not applied to terminals 1 and 2

10 kΩ or higher

Battery voltage applied to terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the ST relay.