| 
                     
                        | Last Modified: 08-21-2023 | 6.11:8.1.0 | Doc ID: RM100000001PTI9 |  
                        | Model Year Start: 2021 | Model: Avalon | Prod Date Range: [08/2020 -                    
                                       ] |  
                        | Title: A25A-FKS (STARTING): STARTER: INSTALLATION; 2021 - 2022 MY Avalon [08/2020 -        ] |  INSTALLATIONPROCEDURE1. INSTALL STARTER ASSEMBLY (a) Install the starter assembly to the cylinder block sub-assembly with the 2 bolts. Torque:  46 N·m {469 kgf·cm, 34 ft·lbf} (b) Connect the No. 2 engine wire to terminal 30 with the nut. Torque:  9.8 N·m {100 kgf·cm, 87 in·lbf} (c) Close the terminal cap. (d) Connect the starter assembly connector. 2. INSTALL FLYWHEEL HOUSING SIDE COVER 
                     
                        
                           | (a) Align the protrusion with the cylinder block sub-assembly and engage the claw as shown in the illustration to install the flywheel housing side cover. 
                                 NOTICE: 
                                    
Make sure the claw makes a click sound, indicating that it fits tightly.
Replace the flywheel housing side cover with a new one if the claw does not fit tightly or is deformed.
 |  |  3. INSTALL FRONT ENGINE MOUNTING INSULATOR Click here
                        
                           
                              ![2021 - 2022 MY Avalon [08/2020 -        ]; A25A-FKS (ENGINE CONTROL): ACTIVE CONTROL ENGINE MOUNT: INSTALLATION](/t3Portal/stylegraphics/info.gif)  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Click here
                        
                           
                              ![2021 - 2022 MY Avalon [08/2020 -        ]; MAINTENANCE: A25A-FKS BATTERY: INSTALLATION+](/t3Portal/stylegraphics/info.gif)  |