Last Modified: 08-21-2023 |
6.11:8.1.0 |
Doc ID: RM100000001JUB3 |
Model Year Start: 2020 |
Model: Avalon HV |
Prod Date Range: [08/2019 -
] |
Title: HEATING / AIR CONDITIONING: BLOWER UNIT: INSTALLATION; 2020 - 2022 MY Avalon Avalon HV [08/2019 - ] |
INSTALLATION
PROCEDURE
1. INSTALL BLOWER ASSEMBLY
(a) Engage the 2 guides and 2 claws.
(b) Install the blower assembly to the air conditioning radiator assembly with the 2 screws.
(c) Engage each guide.
(d) Connect the connector.
2. INSTALL NO. 2 AIR DUCT
Click here
3. INSTALL AIR CONDITIONER UNIT ASSEMBLY
for A25A-FXS:
Click here
for 2GR-FKS:
Click here
|