| 
                     
                        | Last Modified: 08-21-2023 | 6.11:8.1.0 | Doc ID: RM100000001JUB3 |  
                        | Model Year Start: 2020 | Model: Avalon HV | Prod Date Range: [08/2019 -                    
                                       ] |  
                        | Title: HEATING / AIR CONDITIONING: BLOWER UNIT: INSTALLATION; 2020 - 2022 MY Avalon Avalon HV [08/2019 -        ] |  INSTALLATIONPROCEDURE1. INSTALL BLOWER ASSEMBLY (a) Engage the 2 guides and 2 claws. (b) Install the blower assembly to the air conditioning radiator assembly with the 2 screws. (c) Engage each guide. (d) Connect the connector. 2. INSTALL NO. 2 AIR DUCT Click here
                        
                           
                              ![2020 - 2022 MY Avalon HV [08/2019 -        ]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for HV Model): REASSEMBLY+](/t3Portal/stylegraphics/info.gif)  3. INSTALL AIR CONDITIONER UNIT ASSEMBLY for A25A-FXS: Click here
                        
                           
                              ![2020 - 2021 MY Avalon HV [08/2019 - 08/2021]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for HV Model): INSTALLATION](/t3Portal/stylegraphics/info.gif)  ![2022 MY Avalon HV [08/2021 -        ]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for HV Model): INSTALLATION](/t3Portal/stylegraphics/info.gif)  for 2GR-FKS: Click here
                        
                           
                              ![2019 - 2020 MY Avalon [04/2018 - 08/2020]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for Gasoline Model): INSTALLATION](/t3Portal/stylegraphics/info.gif)  ![2021 MY Avalon [08/2020 - 08/2021]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for Gasoline Model): INSTALLATION](/t3Portal/stylegraphics/info.gif)  ![2022 MY Avalon [08/2021 -        ]; HEATING / AIR CONDITIONING: AIR CONDITIONING UNIT (for Gasoline Model): INSTALLATION](/t3Portal/stylegraphics/info.gif)  |