(2) Apply battery voltage across the terminals. When vacuum is applied to the port (F), check that air is sucked into the port (E).
If the result is not as specified, replace the No. 1 vacuum switching valve assembly (for ACIS).
|
|
*a
|
Port (E)
|
*b
|
Port (F)
|
*c
|
Air
|
|
|