| 
                     
                        | Last Modified: 08-21-2023 | 6.11:8.1.0 | Doc ID: RM100000001BMOG |  
                        | Model Year Start: 2019 | Model: Avalon | Prod Date Range: [04/2018 -                    
                                       ] |  
                        | Title: 2GR-FKS (EMISSION CONTROL): PCV VALVE: INSTALLATION; 2019 - 2022 MY Avalon [04/2018 -        ] |  INSTALLATIONPROCEDURE1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) (a) Apply a light coat of engine oil to the O-ring. (b) Using a 22 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH. Torque:  5.0 N·m {51 kgf·cm, 44 in·lbf} NOTICE: When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring. 2. CONNECT VENTILATION HOSE (a) Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it. 3. INSTALL V-BANK COVER SUB-ASSEMBLY Click here
                        
                           
                              ![2019 - 2022 MY Avalon [04/2018 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+](/t3Portal/stylegraphics/info.gif)  |