Last Modified: 08-21-2023 |
6.11:8.1.0 |
Doc ID: RM100000001BMNA |
Model Year Start: 2019 |
Model: Avalon HV |
Prod Date Range: [04/2018 -
] |
Title: A25A-FXS (EMISSION CONTROL): PURGE VALVE: INSTALLATION; 2019 - 2022 MY Avalon HV [04/2018 - ] |
INSTALLATION
PROCEDURE
1. INSTALL PURGE VALVE (PURGE VSV)
(a) Install the purge valve (purge VSV) to the intake manifold with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
|
|
*1
|
No. 1 Fuel Vapor Feed Hose
|
*2
|
No. 2 Fuel Vapor Feed Hose
|
*3
|
Purge Valve (Purge VSV)
|
|
|
(b) Connect the No. 2 fuel vapor feed hose to the purge valve (purge VSV).
(c) Connect the No. 1 fuel vapor feed hose to the purge valve (purge VSV).
(d) Connect the purge valve (purge VSV) connector.
|