|
Last Modified: 09-10-2025 |
6.11:8.1.0 |
Doc ID: RM100000001B3T5 |
|
Model Year Start: 2019 |
Model: Avalon HV |
Prod Date Range: [04/2018 - 08/2020] |
|
Title: HYBRID / BATTERY CONTROL: FUSE BOX (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION; 2019 - 2020 MY Avalon HV [04/2018 - 08/2020] |
INSTALLATION
PROCEDURE
PROCEDURE
1. INSTALL HYBRID BATTERY TERMINAL BLOCK
CAUTION:
Be sure to wear insulated gloves and protective goggles.
(a) Connect the 2 hybrid battery terminal block connectors.
NOTICE:
Make sure that the connectors are connected securely.
|
(b) Install the hybrid battery terminal block to the HV battery with the bolt.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
NOTICE:
Make sure to align the hole of the hybrid battery terminal block with the pin.
|
|
2. INSTALL NO. 1 HV BATTERY SHIELD PANEL
Click here
3. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY
Click here
4. INSTALL HV BATTERY
Click here
|