Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001B3T5
Model Year Start: 2019 Model: Avalon HV Prod Date Range: [04/2018 - 08/2020]
Title: HYBRID / BATTERY CONTROL: FUSE BOX (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION; 2019 - 2020 MY Avalon HV [04/2018 - 08/2020]

INSTALLATION

PROCEDURE

1. INSTALL HYBRID BATTERY TERMINAL BLOCK

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Connect the 2 hybrid battery terminal block connectors.

NOTICE:

Make sure that the connectors are connected securely.

(b) Install the hybrid battery terminal block to the HV battery with the bolt.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

NOTICE:

Make sure to align the hole of the hybrid battery terminal block with the pin.

*a

Pin

2. INSTALL NO. 1 HV BATTERY SHIELD PANEL

Click here 2019 - 2020 MY Avalon HV [04/2018 - 08/2020]; HYBRID / BATTERY CONTROL: BATTERY VOLTAGE SENSOR (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION+

3. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY

Click here 2019 - 2020 MY Avalon HV [04/2018 - 08/2020]; HYBRID / BATTERY CONTROL: BATTERY VOLTAGE SENSOR (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION+

4. INSTALL HV BATTERY

Click here 2019 - 2020 MY Avalon HV [04/2018 - 08/2020]; HYBRID / BATTERY CONTROL: HV BATTERY (for NICKEL METAL HYDRIDE BATTERY): INSTALLATION