1. INSPECT H-LP LH RELAY

*a

Component without harness connected

(H-LP LH Relay)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP LH relay.

2. INSPECT H-LP RH RELAY

*a

Component without harness connected

(H-LP RH Relay)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP RH relay.

3. INSPECT DIM RELAY (w/o Cornering Light)

*a

Component without harness connected

(DIM Relay)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the DIM relay.

4. INSPECT DRL RELAY (w/o Cornering Light)

*a

Component without harness connected

(DRL Relay)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the DRL relay.