Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001AYSC
Model Year Start: 2019 Model: Avalon Prod Date Range: [04/2018 -           ]
Title: 2GR-FKS (ENGINE CONTROL): ECM: INSTALLATION; 2019 - 2022 MY Avalon [04/2018 -        ]

INSTALLATION

PROCEDURE

1. INSTALL NO. 2 ECM BRACKET

(a) Install the No. 2 ECM bracket to the ECM with the 2 screws.

Torque:

4.5 N·m {46 kgf·cm, 40 in·lbf}

2. INSTALL NO. 1 ECM BRACKET

(a) Install the No. 1 ECM bracket to the ECM with the 2 screws.

Torque:

4.5 N·m {46 kgf·cm, 40 in·lbf}

3. INSTALL ECM

(a) Install the ECM with the 2 bolts and nut.

Torque:

8.0 N·m {82 kgf·cm, 71 in·lbf}

NOTICE:

If the ECM has been struck or dropped, replace it.

(b) Connect the 2 ECM connectors and rotate the 2 levers to lock them.

NOTICE:

  • When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.
  • Be sure to securely connect the ECM connectors.

4. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Click here 2019 - 2022 MY Avalon [04/2018 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+

5. INSTALL INLET AIR CLEANER ASSEMBLY

Click here 2019 - 2022 MY Avalon [04/2018 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+

6. INSTALL COOL AIR INTAKE DUCT SEAL

Click here 2019 - 2021 MY Avalon Avalon HV [04/2018 - 08/2021]; EXTERIOR PANELS / TRIM: FRONT BUMPER: INSTALLATION+ 2022 MY Avalon Avalon HV [08/2021 -        ]; EXTERIOR PANELS / TRIM: FRONT BUMPER: INSTALLATION+

7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Click here 2019 - 2022 MY Avalon [04/2018 -        ]; MAINTENANCE: 2GR-FKS BATTERY: INSTALLATION+

8. PERFORM INITIALIZATION

Click here 2019 - 2021 MY Avalon [04/2018 - 08/2021]; 2GR-FKS (ENGINE CONTROL): SFI SYSTEM: PRECAUTION 2022 MY Avalon [08/2021 -        ]; 2GR-FKS (ENGINE CONTROL): SFI SYSTEM: PRECAUTION