Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001AYS1
Model Year Start: 2019 Model: Avalon Prod Date Range: [04/2018 -           ]
Title: 2GR-FKS (ENGINE CONTROL): VACUUM SWITCHING VALVE (for Engine Mounting): REMOVAL; 2019 - 2022 MY Avalon [04/2018 -        ]

REMOVAL

PROCEDURE

1. REMOVE COOL AIR INTAKE DUCT SEAL

Click here 2019 - 2021 MY Avalon Avalon HV [04/2018 - 08/2021]; EXTERIOR PANELS / TRIM: FRONT BUMPER: REMOVAL+ 2022 MY Avalon Avalon HV [08/2021 -        ]; EXTERIOR PANELS / TRIM: FRONT BUMPER: REMOVAL+

2. REMOVE INLET AIR CLEANER ASSEMBLY

Click here 2019 - 2021 MY Avalon [04/2018 - 08/2021]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2022 MY Avalon [08/2021 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+

3. REMOVE AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Click here 2019 - 2021 MY Avalon [04/2018 - 08/2021]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2022 MY Avalon [08/2021 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+

4. REMOVE VACUUM SWITCHING VALVE (for Active Control Engine Mount System)

(a) Remove the bolt and disengage the wire harness clamp to separate the engine wire.

(b) Remove the 2 bolts.

(c) Disengage the wire harness clamp and disconnect the vacuum switching valve (for active control engine mount system) connector.

(d) Disconnect the 3 vacuum hoses from the vacuum switching valve (for active control engine mount system).

(e) Remove the nut and vacuum switching valve (for active control engine mount system) from the front engine mounting insulator.