|
Last Modified: 09-10-2025 |
6.11:8.1.0 |
Doc ID: RM100000001AYBV |
|
Model Year Start: 2019 |
Model: Avalon HV |
Prod Date Range: [04/2018 - 08/2019] |
|
Title: HEATING / AIR CONDITIONING: PTC HEATER ASSEMBLY: INSPECTION; 2019 MY Avalon HV Avalon [04/2018 - 08/2019] |
INSPECTION
PROCEDURE
PROCEDURE
1. INSPECT QUICK HEATER ASSEMBLY
|
*a
|
Component without harness connected
(Quick Heater Assembly)
|
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
|
Tester Connection
|
Condition
|
Specified Condition
|
|
G115-1 (B) - G115-2 (E)
|
Always
|
10 kΩ or less
|
|
G115-3 (B) - G114-1 (E)
|
Always
|
10 kΩ or less
|
|
G115-3 (B) - G115-2 (E)
|
Always
|
10 kΩ or less
|
|
G114-2 (B) - G114-1 (E)
|
Always
|
10 kΩ or less
|
|