Last Modified: 08-21-2023 6.11:8.1.0 Doc ID: RM100000001AYBV
Model Year Start: 2019 Model: Avalon HV Prod Date Range: [04/2018 - 08/2019]
Title: HEATING / AIR CONDITIONING: PTC HEATER ASSEMBLY: INSPECTION; 2019 MY Avalon Avalon HV [04/2018 - 08/2019]

INSPECTION

PROCEDURE

1. INSPECT QUICK HEATER ASSEMBLY

*a

Component without harness connected

(Quick Heater Assembly)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

G115-1 (B) - G115-2 (E)

Always

10 kΩ or less

G115-3 (B) - G114-1 (E)

Always

10 kΩ or less

G115-3 (B) - G115-2 (E)

Always

10 kΩ or less

G114-2 (B) - G114-1 (E)

Always

10 kΩ or less