Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM100000001T9RL |
Model Year Start: 2021 |
Model: Camry HV |
Prod Date Range: [10/2020 -
] |
Title: EXTERIOR PANELS / TRIM: GRILLE SHUTTER: INSTALLATION; 2021 - 2024 MY Camry HV [10/2020 - ] |
INSTALLATION
PROCEDURE
1. INSTALL RADIATOR SHUTTER SUB-ASSEMBLY
(a) Engage the 2 guides as shown in the illustration.
|
Install in this Direction
|
(b) Install the radiator shutter sub-assembly with the 3 bolts.
Torque:
5.5 N·m {56 kgf·cm, 49 in·lbf}
(c) Connect the connector.
2. INSTALL THERMISTOR ASSEMBLY
Click here
3. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE LH
(a) Engage the 2 claws to install the front radiator side air guide plate LH.
4. INSTALL FRONT RADIATOR SIDE AIR GUIDE PLATE RH
(a) Engage the 2 claws to install the front radiator side air guide plate RH.
5. INSTALL FRONT BUMPER ASSEMBLY
Click here
6. INITIALIZATION GRILLE SHUTTER SYSTEM
Click here
|