Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM10000000156C6
Model Year Start: 2018 Model: Camry HV Prod Date Range: [07/2017 -           ]
Title: A25A-FXS (COOLING): FLOW SHUTTING VALVE: INSPECTION; 2018 - 2024 MY Camry HV [07/2017 -        ]

INSPECTION

PROCEDURE

1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

1 - 2

20°C (68°F)

22 to 28 Ω

If the result is not as specified, replace the flow shutting valve (water by-pass hose assembly).

*a

Component without harness connected

(Flow Shutting Valve (Water By-pass Hose Assembly))