Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM100000001542H |
Model Year Start: 2018 |
Model: Camry HV |
Prod Date Range: [07/2017 - 10/2020] |
Title: REAR SUSPENSION: REAR TRAILING ARM: INSTALLATION; 2018 - 2020 MY Camry HV [07/2017 - 10/2020] |
INSTALLATION
CAUTION / NOTICE / HINT
HINT:
-
Use the same procedure for the RH side and LH side.
-
The following procedure is for the LH side.
PROCEDURE
1. INSTALL REAR SUSPENSION ARM BRACKET
(a) Temporarily install the rear suspension arm bracket to the rear trailing arm assembly with the bolt and nut.
NOTICE:
Insert the bolt from the inside of the vehicle.
|
|
(b) Position the rear trailing arm assembly as shown in the illustration.
Reference Length (A):
120 mm (4.72 in.)
|
|
*a
|
Upper Surface of Rear Suspension Arm Bracket
|
|
|
(c) Fully tighten the nut.
Torque:
120 N·m {1224 kgf·cm, 89 ft·lbf}
2. INSTALL REAR SUSPENSION ARM COVER
(a) Engage the 4 claws and install the rear suspension arm cover.
3. INSTALL REAR TRAILING ARM ASSEMBLY
(a) Using a transmission jack and a wooden block, support the rear No. 2 suspension arm assembly.
NOTICE:
-
When jacking up the rear No. 2 suspension arm assembly, be sure to jack it up slowly.
-
Make sure to perform this operation with the vehicle kept as low as possible.
(b) Install the rear trailing arm assembly to the vehicle with the 4 bolts.
Torque:
90 N·m {918 kgf·cm, 66 ft·lbf}
(c) Install the rear trailing arm assembly to the rear axle carrier sub-assembly with the 2 bolts.
Torque:
135 N·m {1377 kgf·cm, 100 ft·lbf}
4. INSTALL NO. 2 PARKING BRAKE WIRE ASSEMBLY
(a) Install the No. 2 parking brake wire assembly to the rear trailing arm assembly with the nut.
Torque:
15.5 N·m {158 kgf·cm, 11 ft·lbf}
(b) Engage the 2 clamps.
5. INSTALL REAR STABILIZER LINK ASSEMBLY
Click here
6. INSTALL NO. 2 FLOOR UNDER COVER (for LH Side)
(a) Install the No. 2 floor under cover with the 2 grommets (B) and clip (C).
|
|
(b) Install the bolt and clip (A).
Torque:
Bolt :
7.5 N·m {76 kgf·cm, 66 in·lbf}
7. INSTALL NO. 1 FLOOR UNDER COVER (for RH Side)
(a) Install the No. 1 floor under cover with the 2 grommets (B).
|
|
(b) Install the bolt and clip (A).
Torque:
Bolt :
7.5 N·m {76 kgf·cm, 66 in·lbf}
8. INSTALL REAR WHEEL
Click here
9. INSPECT AND ADJUST REAR WHEEL ALIGNMENT
Click here
10. PERFORM INITIALIZATION
-
Intelligent clearance sonar system
-
Intuitive parking assist system
|
|
Parking assist monitor system
|
for Initialization
for Calibration
|
Panoramic view monitor system
|
for Initialization
for Calibration
|
Lighting system (w/ AFS)(EXT)
|
|
|