Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM10000000152HT
Model Year Start: 2018 Model: Camry HV Prod Date Range: [07/2017 -           ]
Title: LIGHTING (EXT): RELAY: ON-VEHICLE INSPECTION; 2018 - 2024 MY Camry HV [07/2017 -        ]

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT H-LP LH RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP LH relay.

2. INSPECT H-LP RH RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP RH relay.

3. INSPECT DIM RELAY (w/o AFS)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the DIM relay.

4. INSPECT DRL RELAY (for LED Type Turn Signal Light without AFS)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the DRL relay.