Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM10000000151JJ
Model Year Start: 2018 Model: Camry HV Prod Date Range: [07/2017 -           ]
Title: METER / GAUGE / DISPLAY: COMBINATION METER: INSTALLATION; 2018 - 2024 MY Camry HV [07/2017 -        ]

INSTALLATION

PROCEDURE

1. INSTALL COMBINATION METER ASSEMBLY

(a) Connect each connector.

(b) Engage the clamp.

(c) Engage the 2 clips as shown in the illustration.

Install in this Direction

(d) Install the combination meter assembly with the 3 screws.

2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY

(a) Connect the connector.

(b) Engage the 2 guides and 4 clips as shown in the illustration.

Install in this Direction

(c) Install the 2 clips.

(d) Engage the 4 clips and 2 claws to install the instrument cluster finish panel assembly.

Install in this Direction

3. INSTALL NO. 2 METER HOOD CLUSTER

Click here 2018 - 2020 MY Camry HV [07/2017 - 10/2020]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+ 2021 - 2024 MY Camry HV [10/2020 -        ]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+

4. INSTALL NO. 1 METER HOOD CLUSTER

Click here 2018 - 2024 MY Camry HV [07/2017 -        ]; INTERIOR PANELS / TRIM: FRONT CONSOLE BOX: INSTALLATION+

5. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL

Click here 2018 - 2019 MY Camry HV [07/2017 - 09/2019]; MAINTENANCE: AUXILIARY BATTERY: INSTALLATION+ 2020 - 2024 MY Camry HV [09/2019 -        ]; MAINTENANCE: AUXILIARY BATTERY: INSTALLATION+

6. INSTALL LUGGAGE TRIM SERVICE HOLE COVER

Click here 2018 - 2019 MY Camry HV [07/2017 - 09/2019]; MAINTENANCE: AUXILIARY BATTERY: INSTALLATION+ 2020 - 2024 MY Camry HV [09/2019 -        ]; MAINTENANCE: AUXILIARY BATTERY: INSTALLATION+