Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM100000001TAPR |
Model Year Start: 2021 |
Model: Camry |
Prod Date Range: [10/2020 -
] |
Title: HEATING / AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION; 2021 - 2024 MY Camry [10/2020 - ] |
INSTALLATION
PROCEDURE
1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
(a) Connect the connector.
(b) Engage the 5 claws to install the air conditioning control assembly as shown in the illustration.
|
Install in this Direction
|
2. INSTALL NO. 3 INSTRUMENT PANEL REGISTER ASSEMBLY
Click here
3. INSTALL NO. 2 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Click here
4. INSTALL NO. 1 METER HOOD CLUSTER
Click here
|