Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM100000001MQCD |
Model Year Start: 2020 |
Model: Camry |
Prod Date Range: [03/2020 - 10/2020] |
Title: A25A-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION; 2020 MY Camry [03/2020 - 10/2020] |
INSTALLATION
CAUTION / NOTICE / HINT
CAUTION:
-
The engine assembly with transaxle is very heavy. Be sure to follow the procedure described in the repair manual, or the engine lifter may suddenly drop or the engine assembly with transaxle may fall off the engine lifter.
-
To prevent burns, do not touch the engine, exhaust manifold or other high temperature components while the engine is hot.
PROCEDURE
1. INSTALL REAR NO. 2 ENGINE MOUNTING INSULATOR
HINT:
Perform this procedure only when replacement of the rear No. 2 engine mounting insulator is necessary.
-
for 2WD:
Click here
-
for AWD:
Click here
2. INSTALL ENGINE MOUNTING BRACKET SUB-ASSEMBLY LH
HINT:
Perform this procedure only when replacement of the engine mounting bracket sub-assembly LH is necessary.
(a) Temporarily tighten the bolt (A), and then fully tighten the 4 bolts in the order of (B), (C), (D) and (A).
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
NOTICE:
Make sure that there is no gap between the engine mounting bracket sub-assembly LH and vehicle body before tightening the bolts.
|
|
3. INSTALL ENGINE MOUNTING SPACER
HINT:
Perform this procedure only when replacement of the engine mounting spacer is necessary.
(a) Install the engine mounting spacer to the vehicle body with the 2 bolts.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
NOTICE:
Temporarily tighten the bolt (A), and then fully tighten the 2 bolts in the order of (B) and (A).
|
|
4. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH
HINT:
Perform this procedure only when replacement of the engine mounting insulator sub-assembly RH is necessary.
(a) Install the engine mounting insulator sub-assembly RH with the 2 bolts and nut.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
NOTICE:
Temporarily tighten the bolt (A), and then fully tighten the 2 bolts and nut in the order of (B), (A) and (C).
|
|
(b) Engage the clamp.
(c) Connect the No. 2 earth wire to the engine mounting insulator sub-assembly RH with the bolt.
Torque:
9.5 N·m {97 kgf·cm, 84 in·lbf}
(d) Connect the bracket to the engine mounting insulator sub-assembly RH with the bolt.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
(e) Install the radiator reserve tank assembly with the bolt and nut in the order shown in the illustration.
Torque:
5.0 N·m {51 kgf·cm, 44 in·lbf}
|
|
(f) Engage the No. 6 water by-pass hose.
5. INSTALL ENGINE HANGERS
Click here
6. REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
(a) Remove the engine assembly from the engine stand.
7. INSTALL ENGINE WIRE
(a) Install the engine wire to the engine assembly.
8. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
Click here
9. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
Click here
10. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
-
for 2WD:
Click here
-
for AWD:
Click here
11. INSTALL STARTER ASSEMBLY
-
for 2WD:
Click here
-
for AWD:
Click here
12. INSTALL FLYWHEEL HOUSING SIDE COVER
Click here
13. INSTALL FRONT ENGINE MOUNTING BRACKET
-
for 2WD:
Click here
-
for AWD:
Click here
14. INSTALL REAR ENGINE MOUNTING INSULATOR (for 2WD)
HINT:
Perform this procedure only when replacement of the rear engine mounting insulator is necessary.
Click here
15. INSTALL REAR ENGINE MOUNTING INSULATOR (for AWD)
HINT:
Perform this procedure only when replacement of the rear engine mounting insulator is necessary.
(a) Install the rear engine mounting insulator to the front frame assembly with the 4 nuts.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
(b) Install the exhaust sensor clamp bracket with the bolt.
Torque:
13 N·m {133 kgf·cm, 10 ft·lbf}
(c) Install the wiring harness clamp bracket with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
16. INSTALL PROPELLER SHAFT HEAT INSULATOR (for AWD)
Click here
17. INSTALL FRONT ENGINE MOUNTING INSULATOR
HINT:
Perform this procedure only when replacement of the front engine mounting insulator is necessary.
(a) Install the front engine mounting insulator to the front frame assembly with the 3 nuts.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
18. INSTALL FRONT FRAME ASSEMBLY (for 2WD)
(a) Install the rear engine mounting insulator to the front frame assembly with the 4 nuts.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
(b) Install the front engine mounting insulator to the front engine mounting bracket with the bolt.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
19. INSTALL FRONT FRAME ASSEMBLY (for AWD)
(a) Install the rear engine mounting insulator to the front frame assembly with the bolt.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
(b) Install the front engine mounting insulator to the front engine mounting bracket with the bolt.
Torque:
72 N·m {734 kgf·cm, 53 ft·lbf}
20. CONNECT WIRE HARNESS
-
for 2WD:
Click here
-
for AWD:
Click here
21. INSTALL STEERING GEAR HEAT INSULATOR
Click here
22. INSTALL BREATHER PLUG HOSE
-
for 2WD:
Click here
-
for AWD:
Click here
23. CONNECT WATER BY-PASS HOSE ASSEMBLY
-
for 2WD:
Click here
-
for AWD:
Click here
24. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
Click here
25. CONNECT VACUUM HOSE
-
for 2WD:
Click here
-
for AWD:
Click here
26. INSTALL DRIVE PLATE AND TORQUE CONVERTER ASSEMBLY SETTING BOLT
-
for 2WD:
Click here
-
for AWD:
Click here
27. INSTALL FLYWHEEL HOUSING UNDER COVER
(a) Install the flywheel housing under cover to the cylinder block sub-assembly.
28. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
HINT:
Perform "Inspection After Repair" after replacing the engine assembly.
Click here
(a) Set the engine assembly with transaxle on an engine lifter.
NOTICE:
-
Using height adjustment attachments and plate lift attachments, keep the engine assembly with transaxle level.
-
Do not perform any procedures while the engine assembly is suspended because doing so may cause the engine assembly to drop, resulting in injury. However, the engine assembly needs to be suspended when it is installed to or removed from an engine stand.
(b) Remove the 4 bolts, No. 1 engine hanger and No. 2 engine hanger.
(c) for AWD:
(1) Install the fuel pump protector with the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(d) Install the fuel delivery guard to the engine mounting bracket RH with the bolt.
Torque:
40 N·m {408 kgf·cm, 30 ft·lbf}
(e) Operate the engine lifter and install the engine assembly with transaxle to the vehicle.
CAUTION:
Do not raise the engine assembly with transaxle more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.
NOTICE:
-
Make sure that the engine assembly with transaxle is clear of all wiring and hoses.
-
While raising the engine assembly with transaxle into the vehicle, do not allow it to contact the vehicle.
(f) Install the front bumper extension sub-assembly RH and front bumper extension sub-assembly LH to the front frame assembly and vehicle body with the 8 bolts.
|
Bolt
|
|
Nut
|
Torque:
Bolt (A) :
9.0 N·m {92 kgf·cm, 80 in·lbf}
Bolt (B) :
12.5 N·m {127 kgf·cm, 9 ft·lbf}
Bolt (C) :
135 N·m {1377 kgf·cm, 100 ft·lbf}
(g) Install the front suspension member bracket sub-assembly RH and front suspension member bracket sub-assembly LH to the front frame assembly and vehicle body with the 4 bolts and 2 nuts.
Torque:
Bolt (D) :
17.5 N·m {178 kgf·cm, 13 ft·lbf}
Bolt (E) :
135 N·m {1377 kgf·cm, 100 ft·lbf}
Nut :
17.5 N·m {178 kgf·cm, 13 ft·lbf}
(h) Install the rear No. 2 engine mounting insulator to the engine mounting bracket sub-assembly LH with the bolt and nut.
Torque:
42 N·m {428 kgf·cm, 31 ft·lbf}
NOTICE:
While holding the bolt in place, tighten the nut.
(i) Install the engine mounting insulator sub-assembly RH to the engine mounting bracket RH with the 3 bolts and nut.
Torque:
Bolt :
72 N·m {734 kgf·cm, 53 ft·lbf}
Nut :
42 N·m {428 kgf·cm, 31 ft·lbf}
(j) Install the body mounting plate with the 6 bolts.
Torque:
17.5 N·m {178 kgf·cm, 13 ft·lbf}
(k) Engage the clamp.
29. INSTALL FRONT DRIVE SHAFT ASSEMBLY
Click here
30. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst) (for 2WD)
Click here
31. INSTALL PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY (for AWD)
Click here
32. CONNECT STEERING INTERMEDIATE SHAFT ASSEMBLY
Click here
33. CONNECT NO. 5 WATER BY-PASS HOSE
(a) Engage the clamp.
(b) Connect the No. 5 water by-pass hose to the No. 3 water by-pass pipe and slide the clip to secure it.
34. CONNECT WIRE HARNESS
(a) Connect the wire harness to the body with the bolt.
Torque:
Bolt (A) :
8.0 N·m {82 kgf·cm, 71 in·lbf}
|
|
(b) Connect the earth wire to the automatic transaxle assembly with the bolt.
Torque:
Bolt (B) :
20 N·m {204 kgf·cm, 15 ft·lbf}
(c) Connect the wire harness to the positive (+) battery terminal with the nut.
Torque:
Nut (C) :
7.6 N·m {77 kgf·cm, 67 in·lbf}
(d) Engage the 3 clamps.
(e) Engage the claw to install the wire harness to the engine room relay block and junction block assembly.
(f) Connect the 4 connectors to the engine room relay block and junction block assembly.
(g) Install the nut to the engine room relay block and junction block assembly.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
(h) Install the No. 2 relay block cover to the engine room relay block and junction block assembly.
35. CONNECT NO. 1 COOLER REFRIGERANT DISCHARGE HOSE SUB-ASSEMBLY
Click here
36. CONNECT SUCTION HOSE SUB-ASSEMBLY
Click here
37. CONNECT NO. 2 RADIATOR HOSE
(a) Connect the No. 2 radiator hose to the water inlet and slide the clip to secure it.
38. CONNECT NO. 1 RADIATOR HOSE
(a) Connect the No. 1 radiator hose to the water outlet and slide the clip to secure it.
(b) Engage the clamp to connect the No. 1 radiator hose to the No. 1 radiator bracket.
39. CONNECT FUEL TUBE SUB-ASSEMBLY
(a) Connect the fuel tube sub-assembly.
(1) Connect the fuel tube sub-assembly to the fuel pipe.
Click here
(b) Install the No. 1 fuel pipe clamp to the fuel tube connector.
40. CONNECT INLET HEATER HOSE
(a) Align the protrusions of the inlet heater hose connector with the cutouts in the flow shutting valve (water by-pass hose assembly) and push them together until the inlet heater hose connector makes a "click" sound.
|
|
(b) Push in the retainer.
*a
|
Retainer
|
|
Push
|
|
Push in
|
(c) Check that the flow shutting valve (water by-pass hose assembly) and inlet heater hose connector are securely connected by pulling on them.
41. CONNECT OUTLET HEATER HOSE
(a) Align the protrusion of the No. 2 water by-pass pipe sub-assembly with the cutout in the outlet heater hose connector and push them together until the outlet heater hose makes a "click" sound.
|
|
(b) Push in the retainer.
*a
|
Retainer
|
|
Push
|
|
Push in
|
(c) Check that the No. 2 water by-pass pipe sub-assembly and outlet heater hose connector are securely connected by pulling on them.
42. CONNECT UNION TO CHECK VALVE HOSE
(a) Connect the union to check valve hose to the vacuum pump assembly and slide the clip to secure it.
43. CONNECT NO. 1 FUEL VAPOR FEED HOSE
(a) Connect the No. 1 fuel vapor feed hose to the No. 1 vacuum switching valve assembly and slide the clip to secure it.
44. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the transmission control cable assembly to the No. 1 transmission control cable bracket with a new clip.
(b) Connect the transmission control cable assembly to the transmission control shaft lever as shown in the illustration.
NOTICE:
Before installing the transmission control cable assembly, check that the park/neutral position switch assembly and shift lever are in N.
|
|
45. INSTALL BATTERY CLAMP SUB-ASSEMBLY
(a) Install the battery clamp sub-assembly with the 3 bolts.
Torque:
18.5 N·m {189 kgf·cm, 14 ft·lbf}
(b) Engage the 4 clamps to the battery clamp sub-assembly.
46. INSTALL BATTERY
Click here
47. INSTALL ECM
Click here
48. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
(a) Install the air cleaner assembly with air cleaner hose to the throttle body with motor assembly and unlock the hose clamp to secure it as shown in the illustration.
NOTICE:
Align the cutout of the air cleaner hose with the protrusion of the throttle body with motor assembly.
|
|
*a
|
Protrusion
|
*b
|
Cutout
|
*c
|
Top
|
*d
|
Front of Vehicle
|
*e
|
Locked
|
*f
|
Unlocked
|
|
|
(b) Connect the No. 2 ventilation hose to the cylinder head cover sub-assembly and slide the clip to secure it.
NOTICE:
Make sure to position the clip as shown in the illustration.
|
|
*a
|
Top
|
*b
|
Front of Vehicle
|
*c
|
45°(Claw of Clip Location)
|
*d
|
Paint Mark
|
|
|
(c) Fit the pin of the air cleaner assembly with air cleaner hose into the air cleaner support as shown in the illustration.
NOTICE:
-
Insert the 3 pins of the air cleaner assembly into the 3 air cleaner supports at the same time.
-
Check that the pins are securely inserted into air cleaner supports.
|
|
(d) Engage the vacuum hose to the air cleaner hose.
(e) Engage the 3 wire harness clamps.
(f) Connect the mass air flow meter sub-assembly connector.
49. INSTALL INLET AIR CLEANER ASSEMBLY
(a) Install the inlet air cleaner assembly with the 2 bolts in the order shown in the illustration.
Torque:
8.0 N·m {82 kgf·cm, 71 in·lbf}
|
|
50. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
(a) for 2WD:
(1) Engage the 3 clips to install the No. 1 engine cover sub-assembly.
|
|
(b) for AWD:
(1) Engage the 3 clips to install the No. 1 engine cover sub-assembly.
|
|
51. INSPECT VACUUM HOSES
(a) for 2WD:
(1) Inspect the vacuum hoses.
(b) for AWD:
(1) Inspect the vacuum hoses.
52. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
53. ADD ENGINE OIL
Click here
54. ADD ENGINE COOLANT
Click here
55. ADD AUTOMATIC TRANSAXLE FLUID
-
for 2WD:
Click here
-
for AWD:
Click here
56. ADD TRANSFER OIL (for AWD)
Click here
57. CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
for HFC-134a (R134a):
Click here
for HFO-1234yf (R1234yf):
Click here
58. WARM UP ENGINE
for HFC-134a (R134a):
Click here
for HFO-1234yf (R1234yf):
Click here
59. INSPECT SHIFT LEVER POSITION
Click here
60. ADJUST SHIFT LEVER POSITION
Click here
61. INSPECT FOR ENGINE OIL LEAK
Click here
62. INSPECT FOR COOLANT LEAK
Click here
63. INSPECT FOR REFRIGERANT LEAK
for HFC-134a (R134a):
Click here
for HFO-1234yf (R1234yf):
Click here
64. INSPECT FOR FUEL LEAK
Click here
65. INSPECT FOR EXHAUST GAS LEAK
Click here
66. CHECK ENGINE OIL LEVEL
Click here
67. INSPECT ENGINE COOLANT LEVEL IN RESERVOIR TANK
Click here
68. INSTALL FRONT LOWER BUMPER ABSORBER
(a) Engage the 2 claws to install the front lower bumper absorber.
(b) Install the 4 bolts.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
69. INSTALL FRONT BUMPER COVER
Click here
70. INSTALL FRONT FENDER APRON SEAL LH
(a) Install the front fender apron seal LH with the 2 screws and clip.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
71. INSTALL FRONT FENDER APRON SEAL RH
(a) Install the front fender apron seal RH with the 2 screws and clip.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
72. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
(a) Install the No. 2 engine under cover assembly with the 4 screws and 6 clips.
Torque:
7.5 N·m {76 kgf·cm, 66 in·lbf}
73. INSTALL NO. 1 ENGINE UNDER COVER
(a) Install the No. 1 engine under cover with the bolt, 6 screws and 2 clips.
Torque:
Bolt :
7.5 N·m {76 kgf·cm, 66 in·lbf}
74. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
(a) Install the front wheel opening extension pad LH with the 3 screws.
75. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
(a) Install the front wheel opening extension pad RH with the 3 screws.
76. INSTALL FRONT WHEELS
Click here
77. ALIGN FRONT WHEELS FACING STRAIGHT AHEAD
78. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
Click here
79. PERFORM INITIALIZATION
Click here
80. INSPECT IGNITION TIMING
Click here
81. INSPECT ENGINE IDLE SPEED
Click here
82. INSPECT CO/HC
Click here
83. CHECK SPEED SENSOR SIGNAL
w/ Electric Parking Brake System: Click here
w/o Electric Parking Brake System: Click here
|