Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM100000001532N |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [06/2017 -
] |
Title: NETWORKING: CAN COMMUNICATION SYSTEM: Check Bus 2 Line for Short to +B; 2018 - 2024 MY Camry [06/2017 - ] |
Check Bus 2 Line for Short to +B
|
DESCRIPTION
There may be a short circuit between one of the CAN bus lines and +B when there is no resistance between terminal 18 (CA4H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 17 (CA4L) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3.
Symptom
|
Trouble Area
|
There is no resistance between terminal 18 (CA4H) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3, or terminal 17 (CA4L) of the central gateway ECU (network gateway ECU) and terminal 16 (BAT) of the DLC3.
|
-
Short to +B in CAN main bus line
-
Central gateway ECU (network gateway ECU)
-
ECM
-
No. 2 CAN junction connector
-
No. 4 CAN junction connector
|
WIRING DIAGRAM
CAUTION / NOTICE / HINT
CAUTION:
When performing the confirmation driving pattern, obey all speed limits and traffic laws.
HINT:
-
Before disconnecting related connectors for inspection, push in on each connector body to check that the connector is not loose or disconnected.
-
When a connector is disconnected, check that the terminals and connector body are not cracked, deformed or corroded.
PROCEDURE
1.
|
CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 2 CAN JUNCTION CONNECTOR)
|
(a) Disconnect the cable from the negative (-) battery terminal.
(b) Disconnect the A67 No. 2 CAN junction connector.
(c) Measure the resistance according to the value(s) in the table below.
*A
|
Before Jul. 2018 Production
|
*B
|
From Jul. 2018 Production
|
*1
|
DLC3
|
-
|
-
|
*a
|
Front view of wire harness connector
(to No. 2 CAN Junction Connector)
|
*b
|
to No. 4 CAN Junction Connector
|
*c
|
to ECM
|
-
|
-
|
Standard Resistance:
Before Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
A67-10 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
No. 4 CAN junction connector
|
A67-21 (CANL) - K68-16 (BAT)
|
A67-11 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
ECM
|
A67-22 (CANL) - K68-16 (BAT)
|
From Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
A67-10 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
No. 4 CAN junction connector
|
A67-21 (CANL) - K138-16 (BAT)
|
A67-11 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
ECM
|
A67-22 (CANL) - K138-16 (BAT)
|
Result
|
Proceed to
|
OK
|
A
|
NG (Line to ECM)
|
B
|
NG (Line to No. 4 CAN junction connector)
|
C
|
A |
|
REPLACE NO. 2 CAN JUNCTION CONNECTOR
|
B
|
|
|
2.
|
CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 2 CAN JUNCTION CONNECTOR - ECM)
|
(a) Disconnect the A21 or A24 ECM connector.
(b) Measure the resistance according to the value(s) in the table below.
*A
|
Before Jul. 2018 Production
|
*B
|
From Jul. 2018 Production
|
*1
|
DLC3
|
-
|
-
|
*a
|
Front view of wire harness connector
(to No. 2 CAN Junction Connector)
|
*b
|
to ECM
|
Standard Resistance:
Before Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
A67-11 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
A67-22 (CANL) - K68-16 (BAT)
|
From Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
A67-11 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
A67-22 (CANL) - K138-16 (BAT)
|
Result
|
Proceed to
|
OK (for A25A-FKS)
|
A
|
OK (for 2GR-FKS)
|
B
|
NG
|
C
|
C |
|
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 2 CAN JUNCTION CONNECTOR - ECM)
|
3.
|
CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR - NO. 2 CAN JUNCTION CONNECTOR)
|
(a) Disconnect the K128 No. 4 CAN junction connector.
(b) Measure the resistance according to the value(s) in the table below.
*A
|
Before Jul. 2018 Production
|
*B
|
From Jul. 2018 Production
|
*1
|
DLC3
|
-
|
-
|
*a
|
Front view of wire harness connector
(to No. 4 CAN Junction Connector)
|
*b
|
to No. 2 CAN Junction Connector
|
Standard Resistance:
Before Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
K128-11 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
No. 2 CAN junction connector
|
K128-22 (CANL) - K68-16 (BAT)
|
From Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
K128-11 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
No. 2 CAN junction connector
|
K128-22 (CANL) - K138-16 (BAT)
|
NG |
|
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 4 CAN JUNCTION CONNECTOR - NO. 2 CAN JUNCTION CONNECTOR)
|
OK
|
|
|
4.
|
CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR)
|
(a) Disconnect the K127 No. 4 CAN junction connector.
(b) Measure the resistance according to the value(s) in the table below.
*A
|
Before Jul. 2018 Production
|
*B
|
From Jul. 2018 Production
|
*1
|
DLC3
|
-
|
-
|
*a
|
Front view of wire harness connector
(to No. 4 CAN Junction Connector)
|
*b
|
to Central Gateway ECU (Network Gateway ECU)
|
Standard Resistance:
Before Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
K127-1 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
Central gateway ECU (network gateway ECU)
|
K127-12 (CANL) - K68-16 (BAT)
|
From Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
Connected to
|
K127-1 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
Central gateway ECU (network gateway ECU)
|
K127-12 (CANL) - K138-16 (BAT)
|
OK |
|
REPLACE NO. 4 CAN JUNCTION CONNECTOR
|
NG
|
|
|
5.
|
CHECK FOR SHORT TO +B IN CAN BUS LINE (NO. 4 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
|
(a) Disconnect the K76 central gateway ECU (network gateway ECU) connector.
(b) Measure the resistance according to the value(s) in the table below.
*A
|
Before Jul. 2018 Production
|
*B
|
From Jul. 2018 Production
|
*1
|
DLC3
|
-
|
-
|
*a
|
Front view of wire harness connector
(to No. 4 CAN Junction Connector)
|
*b
|
to Central Gateway ECU (Network Gateway ECU)
|
Standard Resistance:
Before Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
K127-1 (CANH) - K68-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
K127-12 (CANL) - K68-16 (BAT)
|
From Jul. 2018 Production:
Tester Connection
|
Condition
|
Specified Condition
|
K127-1 (CANH) - K138-16 (BAT)
|
Cable disconnected from negative (-) battery terminal
|
6 kΩ or higher
|
K127-12 (CANL) - K138-16 (BAT)
|
NG |
|
REPAIR OR REPLACE CAN MAIN BUS LINE OR CONNECTOR (NO. 4 CAN JUNCTION CONNECTOR - CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU))
|
|