Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM1000000014ZYH
Model Year Start: 2018 Model: Camry Prod Date Range: [06/2017 -           ]
Title: 2GR-FKS (INTAKE / EXHAUST): INTAKE MANIFOLD: INSTALLATION; 2018 - 2024 MY Camry [06/2017 -        ]

INSTALLATION

PROCEDURE

1. INSTALL STUD BOLT

HINT:

If a stud bolt is deformed or the threads are damaged, replace it.

(a) Using an E6 "TORX" socket wrench, install the 2 stud bolts to the intake manifold.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

2. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET

(a) Install 2 new No. 1 intake manifold to head gaskets to each cylinder head sub-assembly.

NOTICE:

  • Align the port holes of the No. 1 intake manifold to head gaskets and cylinder head sub-assembly.
  • Make sure that the No. 1 intake manifold to head gaskets are installed in the correct direction.

3. INSTALL INTAKE MANIFOLD

(a) Temporarily install the intake manifold to the cylinder head sub-assembly with the 4 bolts and 4 nuts.

(b) Tighten the 4 bolts and 4 nuts in the order shown in the illustration.

Bolt

Nut

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

4. INSTALL INJECTOR VIBRATION INSULATOR

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

5. INSTALL NO. 1 DELIVERY PIPE SPACER

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

6. INSTALL FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

7. CONNECT FUEL TUBE SUB-ASSEMBLY

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (FUEL): FUEL INJECTOR (for Port Injection): INSTALLATION+

8. INSTALL NO. 2 ENGINE MOUNTING STAY RH

(a) Install the No. 2 engine mounting stay RH to the intake manifold and front No.1 engine mounting bracket LH with the bolt.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(b) Install the No. 2 engine mounting stay RH to the engine mounting insulator sub-assembly RH with the bolt and 2 nuts.

Bolt

Nut

Torque:

20 N·m {204 kgf·cm, 15 ft·lbf}

(c) Connect the wire harness clamp bracket to the No. 2 engine mounting stay RH with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(d) Connect the wire harness clamp to the wire harness clamp bracket with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

9. INSTALL NO. 1 V-BANK COVER BRACKET

HINT:

Perform this procedure only when replacement of the No. 1 V-bank cover bracket is necessary.

(a) Install the 2 No. 1 V-bank cover brackets to the intake air surge tank assembly.

Torque:

9.0 N·m {92 kgf·cm, 80 in·lbf}

10. INSTALL AIR SURGE TANK TO INTAKE MANIFOLD GASKET

(a) Install a new air surge tank to intake manifold gasket to the intake air surge tank assembly.

11. INSTALL INTAKE AIR SURGE TANK ASSEMBLY

NOTICE:

Do not apply oil to the bolts and nuts as listed below:

Oil Application Prohibited Bolt and Nut

Bolt and Nut for Intake Air Surge Tank Assembly and Intake Manifold

(a) Install the plug to the intake air surge tank assembly.

(b) Temporarily install the intake air surge tank assembly to the intake manifold with the 5 bolts and 2 nuts.

(c) Temporarily install the No. 2 surge tank stay to the intake air surge tank assembly and camshaft housing RH with the 2 bolts.

(d) Tighten the 5 bolts and 2 nuts in the order shown in the illustration.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

Bolt

Nut

(e) Tighten the 2 bolts in the order shown in the illustration.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(f) Engage the clamp to connect the No. 2 air tube to the intake air surge tank assembly.

*1

Vacuum Hose Sub-assembly

*2

Vacuum Hose

*3

No. 2 Air Tube

(g) Engage the clamp to connect the vacuum hose to the intake air surge tank assembly.

(h) Engage the 2 clamps to connect the vacuum hose sub-assembly to the intake air surge tank assembly.

(i) Engage the 2 clamps to connect the vacuum hose sub-assembly to the intake air surge tank assembly.

(j) Connect the vacuum switching valve (for ACIS) connector.

12. CONNECT PURGE VALVE (PURGE VSV)

(a) Connect the purge valve (purge VSV) to the intake air surge tank assembly with the bolt.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(b) Connect the No. 1 fuel vapor feed hose to the intake air surge tank assembly.

13. CONNECT VENTILATION HOSE

(a) Connect the ventilation hose to the intake air surge tank assembly and slide the clip to secure it.

14. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (ENGINE CONTROL): THROTTLE BODY: INSTALLATION

15. INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY

Click here 2018 - 2019 MY Camry [06/2017 - 09/2019]; BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS: BRAKE ACTUATOR: INSTALLATION+ 2020 MY Camry [09/2019 - 10/2020]; BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS: BRAKE ACTUATOR: INSTALLATION+ 2021 - 2024 MY Camry [10/2020 -        ]; BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS: BRAKE ACTUATOR: INSTALLATION+

16. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY

Click here 2018 - 2024 MY Camry [03/2017 -        ]; WIPER / WASHER: FRONT WIPER MOTOR: INSTALLATION

17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click here 2018 MY Camry [06/2017 - 08/2018]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION 2019 MY Camry [08/2018 - 09/2019]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION 2020 MY Camry [09/2019 - 03/2020]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION 2020 MY Camry [03/2020 - 10/2020]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION 2021 - 2022 MY Camry [10/2020 - 08/2022]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION 2023 - 2024 MY Camry [08/2022 -        ]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION

18. INSPECT FOR FUEL LEAK

Click here 2018 - 2024 MY Camry [06/2017 -        ]; 2GR-FKS (FUEL): FUEL SYSTEM: ON-VEHICLE INSPECTION+

19. INSTALL V-BANK COVER SUB-ASSEMBLY

Click here 2018 - 2020 MY Camry [06/2017 - 10/2020]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+ 2021 - 2024 MY Camry [10/2020 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+