Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM1000000014ZY8 |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [06/2017 -
] |
Title: 2GR-FKS (EMISSION CONTROL): PCV VALVE: INSTALLATION; 2018 - 2024 MY Camry [06/2017 - ] |
INSTALLATION
PROCEDURE
1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
(a) Apply a light coat of engine oil to the O-ring.
(b) Using a 22 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.
Torque:
5.0 N·m {51 kgf·cm, 44 in·lbf}
NOTICE:
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
2. CONNECT VENTILATION HOSE
(a) Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
3. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
|