Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM1000000014ZY6
Model Year Start: 2018 Model: Camry Prod Date Range: [06/2017 -           ]
Title: 2GR-FKS (EMISSION CONTROL): PURGE VALVE: REMOVAL; 2018 - 2024 MY Camry [06/2017 -        ]

REMOVAL

PROCEDURE

1. REMOVE V-BANK COVER SUB-ASSEMBLY

Click here 2018 MY Camry [06/2017 - 08/2018]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2019 - 2020 MY Camry [08/2018 - 10/2020]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2021 - 2022 MY Camry [10/2020 - 08/2022]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2023 MY Camry [08/2022 - 08/2023]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+ 2024 MY Camry [08/2023 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: REMOVAL+

2. REMOVE PURGE VALVE (PURGE VSV)

(a) Disconnect the purge valve (purge VSV) connector.

*1

No. 1 Fuel Vapor Feed Hose

*2

Fuel Vapor Feed Hose

(b) Slide the clip and disconnect the fuel vapor feed hose from the purge valve (purge VSV).

(c) Disconnect the No. 1 fuel vapor feed hose from the purge valve (purge VSV).

(d) Remove the bolt and purge valve (purge VSV) from the intake air surge tank assembly.