Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM1000000014UBV |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [06/2017 -
] |
Title: 2GR-FKS (ENGINE CONTROL): IGNITION COIL AND SPARK PLUG: INSTALLATION; 2018 - 2024 MY Camry [06/2017 - ] |
INSTALLATION
PROCEDURE
1. INSTALL SPARK PLUG
Click here
2. INSTALL IGNITION COIL ASSEMBLY
HINT:
Perform "Inspection After Repair" after replacing an ignition coil assembly.
Click here
(a) Install the 3 ignition coil assemblies to the cylinder head cover sub-assembly with the 3 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
NOTICE:
If an ignition coil assembly has been struck or dropped, replace it.
HINT:
Install the same parts to their original positions.
(b) Connect the 3 ignition coil assembly connectors.
(c) Engage the 2 wire harness clamps.
(d) Engage the 4 clamps to install the vacuum hose to the intake air surge tank assembly.
(e) Install the 3 ignition coil assemblies to the cylinder head cover sub-assembly LH with the 3 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
NOTICE:
If an ignition coil assembly has been struck or dropped, replace it.
HINT:
Install the same parts to their original positions.
(f) Connect the 3 ignition coil assembly connectors.
3. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
4. PERFORM INITIALIZATION
(a) Perform "Inspection After Repair" after replacing an ignition coil assembly or spark plug.
Click here
|