Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM1000000013HR4 |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [03/2017 -
] |
Title: A25A-FKS (EMISSION CONTROL): PCV VALVE: INSTALLATION; 2018 - 2024 MY Camry [03/2017 - ] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
(a) Apply a light coat of engine oil to the O-ring.
NOTICE:
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
(b) Install the PCV valve (ventilation valve sub-assembly) to the cylinder head sub-assembly.
2. INSTALL INTAKE MANIFOLD
Click here
|