Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM10000000136SA |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [03/2017 -
] |
Title: A25A-FKS (BATTERY / CHARGING): GENERATOR: INSTALLATION; 2018 - 2024 MY Camry [03/2017 - ] |
INSTALLATION
CAUTION / NOTICE / HINT
NOTICE:
This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click here
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Temporarily install the generator assembly with the bolt.
|
|
(b) Using an E8 "TORX" socket wrench, install the 2 stud bolts.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(c) Install the generator assembly with the bolt and 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(d) Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Close the terminal cap.
(g) Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT
Click here
3. INSTALL E.F.I. VACUUM SENSOR ASSEMBLY (MANIFOLD ABSOLUTE PRESSURE SENSOR)
Click here
4. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
5. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
|